MCV LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

MCV LNG Terminal, also known as Thilawa LNG, is a mothballed LNG import terminal in Myanmar.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
MCV LNG Terminal Thaketa, Myanmar[1][2] 16.788223, 96.218176 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
MCV LNG Terminal import[3] mothballed[4] 0.4 mtpa 0.4 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
MCV LNG Terminal import[3] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
MCV LNG Terminal import[3] mothballed[4] 2020[5] – – 2020[3] 2021 (mothballed)[4]

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
MCV LNG Terminal import[3] mothballed[4] CNTIC VPower [56%]; Myanmar Business Consultant Group Ltd [44%][2][2] Myanmar Business Consultant Group Ltd [44.0%]; CNTIC; VPower Group MCV Terminal[2]

Background

The Hong Kong-headquartered VPower Group partnered with China National Technical Import and Export Corporation for the LNG-fueled power plant in Thaketa Township of Yangon, Myanmar. It began operations on June 14, 2020. It is the first time LNG has been used as fuel for power generation in Myanmar. A floating storage unit (FSU) receives LNG and supplies it to the power station as needed.[6][7] The power station, with an installed capacity of 477.1 MW, was built on a fast-track basis for one of the Myanmar government’s shortlisted critical projects to boost power supply for summer 2020.[8]

The CNTIC VPower Energy floating storage unit (FSU) was used to receive and store LNG imports to supply the regasification facility.[9] The FSU left Myanmar in March 2023 despite having two more years of the contract.[10] Thilawa and Thaketa power stations fueled by the LNG terminal were reportedly idle since 2021, given lack of funds in foreign exchange after the coup.[10] The LNG Terminal is presumed to be mothballed.

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ https://goo.gl/maps/9yU4VcWEmHStiEwe7. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 http://www.mpa.gov.mm/my/ports/mcv-lng-terminal-2/. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20220709142532/https://www.offshore-energy.biz/myanmars-lng-fueled-power-plant-springs-into-action/. Archived from the original on 2022-07-09. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 https://mizzima.com/article/lng-power-generating-vessel-leaves-myanmar. {{cite web}}: Missing or empty |title= (help)
  5. ↑ https://web.archive.org/web/20210616165335/https://www.sumitomocorp.com/en/jp/news/release/2020/group/13600. Archived from the original on 2021-06-16. {{cite web}}: Missing or empty |title= (help)
  6. ↑ Myanmar LNG-to-power project takes FSU delivery. Oil & Gas Journal. November 11, 2020.
  7. ↑ The LNG Industry: GIIGNL Annual Report 2022. GIIGNL. May 2022.
  8. ↑ Adnan Bajic, Myanmar’s LNG-fueled power plant springs into action, Offshore Energy, June 16, 2020
  9. ↑ Smith, Christopher (2020-11-11). "Myanmar LNG-to-power project takes FSU delivery". ogj.com.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ 10.0 10.1 "LNG power-generating vessel leaves Myanmar". mizzima.com. 2023-04-02.{{cite web}}: CS1 maint: url-status (link)