MLNG T9 LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Malaysia LNG Terminal Train 9, also known as Petronas Bintulu LNG Complex, Petronas LNG 9, and MLNG T9, is an operating LNG export terminal in Malaysia.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Malaysia LNG Terminal Train 9 Bintulu, Sarawak, Malaysia[1] 3.2903, 113.087 (exact)

The map below shows the exact location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Malaysia LNG Terminal Train 9 export[2] operating[2] 3.6 mtpa[2] 3.6 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Malaysia LNG Terminal Train 9 export[2] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Malaysia LNG Terminal Train 9 export[2] operating[2] – – – 2016[2] –

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Malaysia LNG Terminal Train 9 export[2] operating[2] Petroliam Nasional Bhd [70%]; State of Sarawak [10%]; ENEOS Corp [10%]; PTT PCL [10%][2][2][2][2] Petroliam Nasional Bhd [70.0%]; ENEOS Holdings Inc [10.0%]; PTT PCL [10.0%]; State of Sarawak [10.0%] Petroliam Nasional[2]

Background

Malaysia LNG Terminal Train 9 is an LNG terminal in Sarawak, Malaysia. It has capacity of 3.6 mtpa and was first commissioned in 2016.[3][4] It is part of the Petronas Bintulu LNG Complex, along with Dua Malaysia LNG Terminal, Satu Malaysia Terminal, and Tiga Malaysia LNG Terminal.

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.google.com/maps/place/3%C2%B017'25.1%22N+113%C2%B005'13.2%22E/@3.2903,113.0844197,1282m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d3.2903!4d113.087?entry=ttu&g_ep=EgoyMDI1MDgxOS4wIKXMDSoASAFQAw%3D%3D. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 (PDF) https://giignl.org/wp-content/uploads/2022/05/GIIGNL2022_Annual_Report_May24.pdf. {{cite web}}: Missing or empty |title= (help)
  3. ↑ "Petronas commissions Train 9 at Bintulu LNG complex," LNG World News, Oct 4, 2016
  4. ↑ International Group of Liquefied Natural Gas Importers (May 24, 2022). "Annual Report 2022 Edition" (PDF). GIIGNL. Retrieved July 11, 2022.{{cite web}}: CS1 maint: url-status (link)