MRG Goody Solar Project Hybrid

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

MRG Goody Solar Project Hybrid is a solar photovoltaic (PV) farm under construction in Lamar County, Texas, United States.

Project Details

Table 1: Phase-level project details for MRG Goody Solar Project Hybrid

Status Commissioning year Nameplate capacity Technology
Construction[1] 2026 (planned)[2] 171.7 MWac[3] PV[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for MRG Goody Solar Project Hybrid

Location Coordinates (WGS 84)
Lamar County, Texas, United States[3] 33.6392, -95.6291 (exact)[3]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.businesswire.com/news/home/20250919935683/en/Nexus-Announces-%24220-Million-of-New-Funding-and-Energy-Offtaker-for-Project-Goody. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://interchange.puc.texas.gov/search/filings/?UtilityType=A&ControlNumber=53385&ItemMatch=0&SortBy=FileStamp&SortOrder=Descending. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  4. ↑ "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)