30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

MVA Helmstedt power station

From Global Energy Monitor
This article is part of the
Global Bioenergy Power Tracker, a Global Energy Monitor project.
Download full dataset
Report an error

MVA Helmstedt power station is an operating power station of at least 45-megawatts (MW) in Landkreis Helmstedt, Lower Saxony, Germany. It is also known as TRV Buschhaus.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
MVA Helmstedt power station Landkreis Helmstedt, Lower Saxony, Germany 52.1702, 10.9783 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1: 52.1702, 10.9783

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Start year
1 Operating[2] bioenergy: wastewater and sewage sludge (solids or biogas)[3] 45[2] 2005[2]

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1 EEW Energy From Waste[4] EEW Energy From Waste GmbH [100%][4] EEW Holding GmbH [99.6%]

Articles and Resources

References

  1. https://web.archive.org/web/20220927145553/https://www.google.com/maps/place/EEW+Energy+from+Waste+Helmstedt+GmbH/@52.171392,10.976479,1175m/data=!3m1!1e3!4m5!3m4!1s0x47a57e135d66b7a5:0x380ac2e24f6ae169!8m2!3d52.1699459!4d10.9783653?hl=en&shorturl=1. Archived from the original on 27 September 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240627164832/https://ibbycongress2020.org/. Archived from the original on 27 June 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20220921160905/https://www.energie-zukunft-helmstedt.de/. Archived from the original on 21 September 2022. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20220923193954/https://wertstoffblog.de/2017/02/15/harzkreis-liefert-grund-zum-feiern-trv-buschhaus-bunkert-siebenmillionste-tonne-abfall/. Archived from the original on 23 September 2022. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of bioenergy power stations, a downloadable dataset, and summary data, please visit the Global Bioenergy Power Tracker on the Global Energy Monitor website.