Madrakah–Al Hawiyah Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Madrakah–Al Hawiyah Gas Pipeline,خط أنابيب التدفق الحر, Known as Haradh–Hawiyah, is an operating gas pipeline in Saudi Arabia.[1][2][3]
Location
The pipeline runs from Madrakah to Hawiyah, Saudi Arabia.[1]
Project details
- Operator:
- Owner: Saudi Aramco[1]
- Parent company: Saudi Aramco[1]
- Capacity: 290 MMcf/d[1]
- Length: 450km[4]
- Diameter:
- Status: operating[1][2][3]
- Start year: 2024[5][3]
- Cost: $4.5 billion[6]
- Financing:
- Associated infrastructure:
Background
The pipeline was built to transfer gas from Madrakah to Hawiyah, Saudi Arabia.
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "https://english.mubasher.info/news/3219495/Aramco-builds-pipeline-to-transfer-gas-to-Al-Hawiyah/". Retrieved 2022-09-16.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|title=
- ↑ 2.0 2.1 "مشاريع ضغط الغاز تدشِّن مشروع خط أنابيب التدفق الحر". www.aramco.com (in العربية). Retrieved 2022-09-16.
- ↑ 3.0 3.1 3.2 "أول مشروع لتخزين الغاز في السعودية ينطلق رسميًا - الطاقة". الطاقة (in العربية). 2024-09-28. Retrieved 2025-08-08.
- ↑ "«أرامكو»: بناء مرافق إنشائية بمعامل ضغط الغاز في حرض والحوية". aawsat.com (in العربية). Retrieved 2025-09-06.
- ↑ https://www.offshore-technology.com/data-insights/haradh-hawiyah-gas-gas-pipeline-saudi-arabia/.
{{cite web}}
: Missing or empty|title=
(help)CS1 maint: url-status (link) - ↑ (اونا), وكالة أنباء النفط (2017-12-01). ""أرامكو" ترسي 3 عقود لتطوير مواقع "حرض والحوية" - ONA™ NEWS / أونا الاخبارية". ONA™ NEWS / أونا الاخبارية. Retrieved 2025-08-08.