30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Madroño solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Madroño solar farm (Planta solar fotovoltaica Madroño Solar) is a solar photovoltaic (PV) farm in pre-construction in Moreruela de Tábara, Zamora, Castilla y León, Spain.

Project Details

Table 1: Phase-level project details for Madroño solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 50 MW[1] PV[1] Amarenco [100%][2] Madroño Solar[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Madroño solar farm

Location Coordinates (WGS 84)
Moreruela de Tábara, Zamora, Castilla y León, Spain[1] 41.7934, -5.8829 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://bocyl.jcyl.es/html/2023/11/15/html/BOCYL-D-15112023-18.do. {{cite web}}: Missing or empty |title= (help)
  2. "Las empresas detrás de los 4 GW renovables menores a 50 MW en tramitación en Castilla y León". Energía Estratégica España. 2023-12-11. Archived from the original on 2024-04-15.