Makat–North Caucasus Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Makat–North Caucasus Pipeline (Russian: Газопровод Макат – Северный Кавказ) is a gas pipeline in Kazakhstan and Russia.[1]

Location

The pipeline runs from Makat, Atyrau region, Kazakhstan, to the North Caucasian Federal District of Russia.[1]

Loading map...

Makat–North Caucasus Looping Pipeline

The pipeline runs from Makat, Atyrau region, Kazakhstan, to Taldykol, Atyrau region, Kazakhstan.[2]

Loading map...

Project details

Project details, Makat–North Caucasus Looping Pipeline

Background

The pipeline is 944 kilometers, has 1,200 and 1,400mm pipeline diameter, a pressure (MPa) of 5.4 and 7.4 at varying points, and one thread.[14] In 2004, the pipeline was connected to the Mozdok Kazimagomed Pipeline, via the Kumli Kizlyar Babayurt Aksai Pipeline. All three pipelines are a part of Russia’s United Gas Transmission System.[15]

In May 2023, QazaqGaz national company and the Akimat (administration) of the Atyrau Region launched a looping section of the Makat-North Caucasus Gas Pipeline in the region’s Makat District. The construction of the looping (or second) line, which runs in parallel to the first one, is valued at approximately 86 billion tenge ($192.2 million). This is one of the projects that QazaqGaz is implementing with the Samruk-Kazyna Sovereign Wealth Fund throughout Kazakhstan. The construction of the looping link will help avoid emergencies related to the shutdown of the single gas pipeline. It will also ensure uninterrupted gas supply to the National Industrial Petrochemical Technopark special economic zone in the Atyrau Region.[13]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "Газопровод Макат - Северный Кавказ". energybase.ru. Retrieved 2022-07-22.{{cite web}}: CS1 maint: url-status (link)
  2. "Рабочий проект «Строительство резервного газопровода (лупинга) Ду1020мм протяженностью 130 км к существующему магистральному газопроводу «Макат-Северный Кавказ» на участке 0-130 км» Макатского и Редутского ЛПУ с разработкой ПСД»" (PDF). www.gov.kz. November 6, 2020. Retrieved July 28, 2023.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "О компании". makhachkala-tr.gazprom.ru (in русский). Retrieved 2022-07-22.
  4. 4.0 4.1 4.2 4.3 "Годовой отчет АО Интергаз Центральная Азия за 2020 год". Intergas Central Asia. 2021. Retrieved 2022-07-22.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 "About the company". Intergas Central Asia. Retrieved 2022-07-22.{{cite web}}: CS1 maint: url-status (link)
  6. MarketScreener. "PJSC GAZPROM : Shareholders Board Members Managers and Company Profile | RU0007661625 | MarketScreener". www.marketscreener.com. Retrieved 2022-07-22.
  7. 7.0 7.1 "National company QazaqGaz JSC (KZTG) - Kazakhstan Stock Exchange (KASE)". kase.kz (in русский). Retrieved 2022-07-22.
  8. "Годовой отчет АО Интергаз Центральная Азия за 2019 год". Intergas Central Asia. 2020. Retrieved 2022-07-22.{{cite web}}: CS1 maint: url-status (link)
  9. "Казахстан: транспортировка и транзит газа". ЦДУ ТЭК. July 3, 2023. Retrieved August 25, 2023.{{cite web}}: CS1 maint: url-status (link)
  10. 10.0 10.1 "Профессиональный опыт » Основные объекты". www.vtg.com.ua. Retrieved 2022-07-22.
  11. 11.0 11.1 11.2 11.3 11.4 "Об утверждении Комплексного плана развития газовой отрасли Республики Казахстан на 2022 – 2026 годы - ИПС "Әділет"". adilet.zan.kz. Retrieved 2022-07-22.
  12. "QazaqGaz запустил вторую нитку газопровода «Макат-Северный Кавказ»". kazinform. May 30, 2023. Retrieved July 27, 2023.{{cite web}}: CS1 maint: url-status (link)
  13. 13.0 13.1 13.2 13.3 "QazaqGaz Launches Second Line of Makat-North Caucasus Gas Pipeline". The Astana Times. May 31, 2023. Retrieved July 28, 2023.{{cite web}}: CS1 maint: url-status (link)
  14. Projects of gas transport facilities VTG, accessed October 28, 2019
  15. Makat – North Caucasus and Mozdok – Kazimagomed pipelines linked Gazprom, November 14, 2005