Malahat LNG Terminal is a cancelled (confirmed) LNG export terminal in Canada.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Malahat LNG Terminal Victoria, Vancouver Island, British Columbia, Canada[1] 48.422, -123.365 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Malahat LNG Terminal export[2] cancelled (confirmed)[2] 6 mtpa[2] 6.0 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Malahat LNG Terminal export[2] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Malahat LNG Terminal export[2] cancelled (confirmed)[2] – – – – 2017 (cancelled)[3]

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Malahat LNG Terminal export[2] cancelled (confirmed)[2] Steelhead LNG Corp [100%][2] Steelhead LNG Corp [100.0%] –

Background

Malahat LNG Terminal was a proposed LNG terminal in British Columbia, Canada.[4]

In 2014, Steelhead LNG applied for licenses to export a cumulative 4.25 bcf/d from one or more liquefaction terminals in British Columbia, with first export anticipated in 2019.[5]

In 2015, the National Energy Board approved the applications, 1 of which was allocated to Malahat LNG for 6 mtpa, the other 4 allocated to Sarita LNG (later renamed Kwispaa LNG) for a 24 mtpa project.[6]

Per Sightline Institute's 2017 report, "The Malahat facility would rely on natural gas delivered by the Island Gas Connector, an 81-mile pipeline proposed by Williams Pipeline Northwest. The new pipeline would begin in Washington State at Northwest Pipeline’s Canadian gas interconnect at Sumas, run along the floor of the Salish Sea for nearly 50 miles, and connect to the proposed Malahat LNG facility. The pipeline would traverse the treaty-protected fishing areas of several tribes, including the Lummi Nation... Steelhead intends to make an investment decision on Malahat in 2018."[7]

Malahat LNG would have taken the form of a floating liquefaction production and export facility at a site on Bamberton industrial land owned by the Malahat Nation.[8]

The project was cancelled in December 2017, with Steelhead LNG planning to focus on its Kwispaa LNG project instead.[9][8]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.google.com/maps/place/48%C2%B025'19.2%22N+123%C2%B021'54.0%22W/@48.422,-123.3675749,739m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d48.422!4d-123.365?entry=ttu&g_ep=EgoyMDI1MDYxNy4wIKXMDSoASAFQAw%3D%3D. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 http://www.sightline.org/research_item/maps-british-columbia-lng-proposals/. {{cite web}}: Missing or empty |title= (help)
  3. ↑ http://www.sightline.org/research_item/maps-british-columbia-lng-proposals/ http://www.sightline.org/research_item/maps-british-columbia-lng-proposals/; http://www.sightline.org/research_item/maps-british-columbia-lng-proposals/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. ↑ Malahat LNG Terminal, Company, accessed April 2017
  5. ↑ "CER – Export Licence Applications". www.cer-rec.gc.ca. Retrieved 2026-06-16.
  6. ↑ "Steelhead LNG receives NEB approval | LNG Industry". www.lngindustry.com. Retrieved 2026-06-16.
  7. ↑ "Mapping BC's LNG Proposals: Twenty projects stall as provincial government’s liquefied natural gas ‘gold rush’ busts," Sightline Institute, March 2017 (contains further footnotes in text)
  8. ↑ 8.0 8.1 Reid, Michael (2017-12-02). "Malahat LNG project scrapped". timescolonist.com. Retrieved 2026-06-16.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "Update: Mapping BC's LNG Proposals" Sightline Institute, January 2018