MLNG T9 LNG Terminal
From Global Energy Monitor
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Malaysia LNG Terminal Train 9, also known as Petronas Bintulu LNG Complex, Petronas LNG 9, and MLNG T9, is an operating LNG export terminal in Malaysia.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Malaysia LNG Terminal Train 9 | Bintulu, Sarawak, Malaysia[1] | 3.2903, 113.087 (exact) |
The map below shows the exact location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Malaysia LNG Terminal Train 9 | export[2] | operating[2] | 3.6 mtpa[2] | 3.6 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Malaysia LNG Terminal Train 9 | export[2] | – | – |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Malaysia LNG Terminal Train 9 | export[2] | operating[2] | – | – | – | 2016[2] | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Malaysia LNG Terminal Train 9 | export[2] | operating[2] | Petroliam Nasional Bhd [70%]; State of Sarawak [10%]; ENEOS Corp [10%]; PTT PCL [10%][2][2][2][2] | Petroliam Nasional Bhd [70.0%]; ENEOS Holdings Inc [10.0%]; PTT PCL [10.0%]; State of Sarawak [10.0%] | Petroliam Nasional[2] |
Background
Malaysia LNG Terminal Train 9 is an LNG terminal in Sarawak, Malaysia. It has capacity of 3.6 mtpa and was first commissioned in 2016.[3][4] It is part of the Petronas Bintulu LNG Complex, along with Dua Malaysia LNG Terminal, Satu Malaysia Terminal, and Tiga Malaysia LNG Terminal.
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ https://www.google.com/maps/place/3%C2%B017'25.1%22N+113%C2%B005'13.2%22E/@3.2903,113.0844197,1282m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d3.2903!4d113.087?entry=ttu&g_ep=EgoyMDI1MDgxOS4wIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 (PDF) https://giignl.org/wp-content/uploads/2022/05/GIIGNL2022_Annual_Report_May24.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ "Petronas commissions Train 9 at Bintulu LNG complex," LNG World News, Oct 4, 2016
- ↑ International Group of Liquefied Natural Gas Importers (May 24, 2022). "Annual Report 2022 Edition" (PDF). GIIGNL. Retrieved July 11, 2022.
{{cite web}}: CS1 maint: url-status (link)
