Mallard Pass solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Mallard Pass solar farm is a solar photovoltaic (PV) farm in pre-construction in Lincolnshire, East Midlands, England, United Kingdom.
Project Details
Table 1: Phase-level project details for Mallard Pass solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Pre-construction[1] | 350 MW[1] | PV[2] | Canadian Solar; Windel Energy (カナディアン・ソーラー・プロジェクト株式会社)[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Mallard Pass solar farm
Location | Coordinates (WGS 84) |
---|---|
Lincolnshire, East Midlands, England, United Kingdom[1] | 52.6912, -0.4497 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
{{cite web}}
: Check date values in:|date=
(help) - ↑ https://web.archive.org/web/20240207071909/https://www.mallardpasssolar.co.uk/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.windelenergy.co.uk/projects/ https://www.windelenergy.co.uk/projects/, https://www.windelenergy.co.uk/projects/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)