Manglai power station (中煤芒来发电项目) is a power station under construction in Sonid Left Banner, Xilingol, Inner Mongolia, China. It is also known as 中煤芒来2×66万千瓦煤电一体化项目 (Unit 1 & 2), 中煤锡林郭勒芒来发电有限公司2×66万千瓦煤电一体化项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Manglai power station | Sonid Left Banner, Xilingol, Inner Mongolia, China | 44.018566, 113.180878 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 44.018566, 113.180878
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
|---|---|---|---|---|---|
| Unit 1 | Construction[1] | coal: lignite[2] | 660[2] | ultra-supercritical[2] | 2025 (planned)[3] |
| Unit 2 | Construction[1] | coal: lignite[2] | 660[2] | ultra-supercritical[2] | 2026 (planned)[3] |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Middling Coal Xilingol Manglai Power Generation Co Ltd [100%] | China National Coal Group [70.2%]; Inner Mongolia Sunit State Owned Assets Management Co Ltd [17.2%]; China Guoxin Holding Corp [6.4%]; China Chengtong Holdings Group Ltd [3.6%]; China Energy Investment Corp [2.7%] |
| Unit 2 | Middling Coal Xilingol Manglai Power Generation Co Ltd [100%] | China National Coal Group [70.2%]; Inner Mongolia Sunit State Owned Assets Management Co Ltd [17.2%]; China Guoxin Holding Corp [6.4%]; China Chengtong Holdings Group Ltd [3.6%]; China Energy Investment Corp [2.7%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The 2 × 660 MW ultra-supercritical units were reported to be permitted to build by the Inner Mongolian Development and Reform Commission in December 2022.[4]
In April 2023, Harbin Electric Group Steam Turbine Company won the bid for the procurement of steam turbines and ancillary equipment for the power station.[5] In May 2023, North China Institute won the bid for unit engineering survey and design.[6] In July 2023, bidding for construction supervision began.[7]
Construction starting ceremony was held on 31 August 2023.[8][9]
Articles and Resources
References
- ↑ 1.0 1.1 "中煤2×660MW煤电一体化项目锅炉基础承台开始浇筑-北极星火力发电网". news.bjx.com.cn. 2023-10-25. Archived from the original on 2024-01-25. Retrieved 2023-11-07.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://news.bjx.com.cn/html/20230901/1329384.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 "中煤芒来电厂低低温静电除尘器设备采购项目招标". https://huanbao.bjx.com.cn/news. 2023-08-07. Archived from the original on 2024-01-25.
{{cite web}}: External link in(help)|website= - ↑ "中煤芒来2×66万千瓦煤电一体化项目取得核准". 北极星火力发电网. 2022-12-27. Retrieved 2023-02-06.
{{cite web}}: CS1 maint: url-status (link) - ↑ 哈电集团汽轮机公司成功中标中煤锡林郭勒芒来2×660MW煤电项目, news.bjx.com.cn, 2023-04-20
- ↑ 【项目】火电|2×1000MW!国家电投分宜发电厂进展!/2×660MW!华北院中标中煤芒来高效超超临界燃煤发电机组工程勘察设计, mp.weixin.qq.com, 2023-05-26
- ↑ 中煤锡林郭勒芒来发电有限公司芒来电厂项目施工监理服务项目项目公告, dlztb.com, 2023-07-05
- ↑ "中煤芒来2×660兆瓦高效超超临界燃煤发电机组工程开工!". 北极星电力网. 2023-09-01. Retrieved 2023-9-14.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "中煤集团2×660MW煤电项目正式开工". 电力项目圈. 2023-09-04.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.