Manzanillo (Haina Investment) power station
Part of the Global Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Manzanillo (Haina Investment) power station (Termoeléctrica Manzanillo (Haina Investment)) is a liquefied natural gas-fueled power station in Manzanillo, Montecristi, Dominican Republic.
Project Details
Table 1: Unit-level details for Manzanillo (Haina Investment) power station
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP[1] | Start year | Retired year |
---|---|---|---|---|---|---|---|
1 | pre-construction[2] | liquefied natural gas[3][4] | 420 MW | combined cycle[3][5][6] | not found | 2026 (planned)[3] | – |
Table 2: Unit-level ownership details for Manzanillo (Haina Investment) power station
Unit name | Operator | Owner | Parent |
---|---|---|---|
1 | Consorcio Haina Investment Corp (Manzanillo Gas & Power)[3][4][7] | Haina Investment Co Ltd[unknown%]; Enerla Energía de las Américas Inc[unknown%]; Shell Gas & Power Development BV[unknown%][3][4] | Haina Investment Co. Ltd.[unknown%]; Enerla Energía de las Américas Inc[unknown%]; Shell Plc[unknown%][3] |
Location
Table 3: Plant-level location details for Manzanillo (Haina Investment) power station
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Manzanillo (Haina Investment) power station | Manzanillo, Montecristi, Dominican Republic | 19.6941, -71.7323 (approximate)[8] |
The map below shows the approximate location of the power station.
Background
As of February 2021, the Dominican government was preparing a tender for rights to develop an 800 MW power station in the Manzanillo region, to be developed in conjunction with a LNG import terminal.[9][10] By July 2021 the government had received twelve bids for the project[6][11], with technical and economic offers expected in October 2021.[11]In May 2022, the Dominican government announced that it had selected a pair of winning bids, resulting in the power plant being split into two separate projects.[4] The first project, to be developed by a consortium led by Haina Investment Corp, was to include a 420 MW combined cycle power station and the associated Manzanillo (Dominican Republic) LNG terminal.[3] The second project, to be developed by a consortium led by Manzanillo Energy, was to include a 392 MW combined cycle power station.[3] According to the terms of the tender, both projects were to be completed within a 42-month time frame.[3]
Articles and Resources
Additional data
To access additional data, including an interactive map of gas-fired power plants, a downloadable dataset, and summary data, please visit the Global Gas Plant Tracker on the Global Energy Monitor website.
References
- ↑ CHP = Combined Heat and Power
- ↑ Bonilla, Dilenni (February 11, 2021). "Gobierno abre en una semana licitación 700 megavatios de gas en la región norte". El Día Nacionales. Archived from the original on February 21, 2021. Retrieved May 19, 2021.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 (PDF) https://web.archive.org/web/20220704044212/https://mem.gob.do/wp-content/uploads/2022/06/Comunicado-Resultados-Licitacion-Manzanillo.pdf.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20220531032436/https://eldinero.com.do/198527/gobierno-dominicano-adjudica-la-central-de-gas-de-manzanillo-la-mayor-del-pais/.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220715003131/http://www.presidencia.gob.do/noticias/presidente-abinader-anuncia-la-contratacion-de-800-mw-en-manzanillo-la-mayor-cantidad-en.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 "Doce empresas participarán en licitación de planta de gas en Manzanillo". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
- ↑ Jairon Severino (March 9, 2023). "Manzanillo se perfila como hub de energía en República Dominicana". Periódico el Dinero.
- ↑ https://goo.gl/maps/R4orFiUXQ4X882gp6.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Dominican Gov. readies tender to install 800MW on natural gas". DominicanToday. February 26, 2021. Archived from the original on May 18, 2021. Retrieved May 19, 2021.
- ↑ "800 MEGAS PARA MANZANILLO - Este es el ranking de las plantas que más energía aportan en República Dominicana | Listín Diario". Listin Diario. July 28, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 11.0 11.1 "To tender: 800MW natural gas power plant in NW". Dominican Today. July 27, 2021. Retrieved November 12, 2021.
{{cite web}}
: CS1 maint: url-status (link)