Manzanillo Power Land power station
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Manzanillo Power Land power station (Central térmica Manzanillo Power Land) is a power station under construction in Pepillo Salcedo (Manzanillo), Montecristi, Dominican Republic.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Manzanillo Power Land power station | Pepillo Salcedo (Manzanillo), Montecristi, Dominican Republic | 19.6765, -71.7016 (exact)[1][2][3][4] |
Unit-level coordinates (WGS 84):
- 1: 19.6765, -71.7016
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
|---|---|---|---|---|---|---|
| 1 | Construction[5][6][7][8][9][10][11][12][13][14] | fossil gas: LNG, other: hydrogen (unknown)[15][16][3][17] | 432[18][15][16] | combined cycle[15][16][3][19] | not found | 2026 (planned)[6] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | Coastal Petroleum Dominicana SA [100%][20] | Coastal Petroleum Dominicana SA [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Manzanillo Power Land power station, along with the Manzanillo Gas & Power and Manzanillo Energy power stations, is one of three large gas-fired power plants under development near Manzanillo, in the northwestern corner of the Dominican Republic.[21] Dominican president Luis Abinader attended a groundbreaking ceremony for the plant in December 2022.[21][22][23] The project is scheduled for completion in 2026.[21]
As of March 2024, according to an article published by Dominican Today, the Manzanillo Power Land project had made "significant strides in construction, including the establishment of local control rooms for turbogenerators, a centralized control room, sewage collection treatment systems, a 295,000-foot tube well, structural foundations for the ACC-Air Cooled Condenser, and foundations for the HRSG Heat Recovery Steam Generation."[24] The same article confirmed that the plant's gas turbine (SGT6-8000H, 269 MW) and steam turbine (SST6, 144 MW), both manufactured by Siemens Energy, had arrived on site.[24] Progress has also been made in other areas related to the project, including transmission line infrastructure.[24]
Subsequent news reports in 2024 confirmed that construction was well underway and estimated that the plant would be ready to begin commercial operations between May 2025[25] and July 2025.[26]
Articles and Resources
References
- ↑ https://goo.gl/maps/XNaRyASa9XzfZiYf8.
{{cite web}}: Missing or empty|title=(help) - ↑ https://goo.gl/maps/2YnmpWqj8vGyxv3N6.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 "Central Gas Natural Manzanillo Power Land". Comisión Nacional de Energía. 2021-12-15. Archived from the original on 2024-01-25.
- ↑ https://livingatlas.arcgis.com/wayback/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.oc.org.do/Servicios/Reportes/postdespacho.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 https://www.facebook.com/watch/?v=2698921607131072.
{{cite web}}: Missing or empty|title=(help) - ↑ "Avances en la construcción de la Central Gas Natural Manzanillo en Montecristi". Portada Nacional. 2024-10-21. Archived from the original on 2024-12-04. Retrieved 2024-10-28.
- ↑ https://web.archive.org/web/20240125105825/https://newsinamerica.com/pdcc/boletin/2022/el-megaproyecto-del-presidente-abinader-para-incrementar-la-oferta-energetica/. Archived from the original on 2024-01-25.
{{cite web}}: Missing or empty|title=(help) - ↑ "Instalación Turbina de Gas - Manzanillo Power Land, Dominican Republic". Lindsayca Inc - Energía 2000 • YouTube. 2024-03-11. Archived from the original on 2024-12-04. Retrieved 2024-10-28.
- ↑ "Energía 2000 fortifies financial backbone for Manzanillo Power Land project". Dominican Today. 2024-03-01. Archived from the original on 2024-05-17. Retrieved 2024-05-15.
- ↑ https://deultimominuto.net/economia/new-fortress-energy/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://mem.gob.do/energia-y-minas-supervisa-avances-de-proyectos-energeticos-clave-en-montecristi-y-santo-domingo/.
{{cite web}}: Missing or empty|title=(help) - ↑ "Presidente Abinader Inicia Construcción del Proyecto de Energía Bahía de Manzanillo". Diario Financiero. 2024-07-09. Archived from the original on 2024-12-04. Retrieved 2024-10-28.
- ↑ https://www.diariolibre.com/economia/energia/2025/08/31/manzanillo-power-land-recibe-buque-que-garantiza-gas-natural/3229742.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 15.2 "CNE Y Energía 2000 Firman Contrato de Concesión Definitiva". Comisión Nacional de Energía. 2022-01-27. Archived from the original on 2024-01-25.
- ↑ 16.0 16.1 16.2 "Resolución SIE-091-2021-RCD" (PDF). SIE (Superintendencia de Electricidad). 2021-10-15. Archived from the original (PDF) on 2024-01-25.
- ↑ https://dr1.com/news/2025/01/29/natural-gas-plant-expected-to-inject-414-mw-into-power-grid-starting-summer/.
{{cite web}}: Missing or empty|title=(help) - ↑ "Energía 2000 da inicio al proyecto de generación termoeléctrica de 414 MW en Manzanillo". Listín Diario. 2022-12-15. Archived from the original on 2024-01-25.
- ↑ https://presidencia.gob.do/noticias/ministro-joel-santos-supervisa-avances-de-trabajos-de-central-termica-manzanillo-power.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://sie.gob.do/wp-content/uploads/2024/12/SIE-140-2024-TC.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 21.0 21.1 21.2 "El megaproyecto del presidente Abinader para incrementar la oferta energética". News in America. December 5, 2022.
- ↑ "Dominican Rep: President Abinader gives the first shovel for the construction of a 414 MW thermoelectric generation plant". BNamericas. December 4, 2022.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Abinader da primer palazo construcción central termoeléctrica Manzanillo Power Land". Hoy Digital. December 3, 2022.
- ↑ 24.0 24.1 24.2 Group, 2006-2020, Merit Designs Consulting. "Energía 2000 fortifies financial backbone for Manzanillo Power Land project". DominicanToday. Retrieved 2024-05-15.
- ↑ "Ministro Joel Santos supervisa avances de trabajos de Central Térmica Manzanillo Power Land". Presidencia de la República Dominicana. 2024-10-21.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Abinader inaugura muelle para construcción de termoeléctrica". Acento. 2024-08-07.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.