Maoji power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Maoji power station (中煤新集能源毛集电厂) is a shelved power station in Maoji Town, Fengtai, Huainan, Anhui, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Maoji power station Maoji Town, Fengtai, Huainan, Anhui, China 32.683922, 116.574257 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 32.683922, 116.574257

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Emergency/Backup
Unit 1 Shelved coal: unknown[1] 660 ultra-supercritical False
Unit 2 Shelved coal: unknown[1] 660 ultra-supercritical False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 China Coal Xinji Energy Co Ltd [100%] China Coal Xinji Energy Co Ltd [100.0%]
Unit 2 China Coal Xinji Energy Co Ltd [100%] China Coal Xinji Energy Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The signing ceremony for the "multi-energy complementary integration project" in Anhui[2] took place in May 2022.[3] It was permitted by November 17, 2022.[4]

Units 1 and 2 had an EIA report accepted in June 2023[5], with the EIA approved in August 2023[6]. No construction news emerged, and in December 2024, the company announced it had no plans to build the project, leading to its shelving[7]. No revived news emerged in 2025-2026[8].

Articles and Resources

References

  1. ↑ 1.0 1.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 中煤新集毛集电厂2×660MW煤电一体化工程项目获批, Beijixing, June 17, 2022
  3. ↑ 2×660MW煤电!安徽毛集实验区“风光火储”多能互补一体化项目签约, Beijixing, May 25, 2022
  4. ↑ 皖发改能源〔2022〕633号, Anhui Province Approvals, 2022-11-17
  5. ↑ "中煤新集毛集电厂EIA受理公示". 北极星电力网. 2023-06-29. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  6. ↑ "毛集电厂EIA报告通过". 微信公众平台. 2023-08-11. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "新集能源暂无建设毛集电厂计划". 微信公众平台. 2024-12-28. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "毛集电厂无复工消息". 北极星电力网. 2026-05-08. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.