Maoji power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Maoji power station (中煤新集能源毛集电厂) is a shelved power station in Maoji Town, Fengtai, Huainan, Anhui, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Maoji power station | Maoji Town, Fengtai, Huainan, Anhui, China | 32.683922, 116.574257 (exact) |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 32.683922, 116.574257
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Emergency/Backup |
|---|---|---|---|---|---|
| Unit 1 | Shelved | coal: unknown[1] | 660 | ultra-supercritical | False |
| Unit 2 | Shelved | coal: unknown[1] | 660 | ultra-supercritical | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | China Coal Xinji Energy Co Ltd [100%] | China Coal Xinji Energy Co Ltd [100.0%] |
| Unit 2 | China Coal Xinji Energy Co Ltd [100%] | China Coal Xinji Energy Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The signing ceremony for the "multi-energy complementary integration project" in Anhui[2] took place in May 2022.[3] It was permitted by November 17, 2022.[4]
Units 1 and 2 had an EIA report accepted in June 2023[5], with the EIA approved in August 2023[6]. No construction news emerged, and in December 2024, the company announced it had no plans to build the project, leading to its shelving[7]. No revived news emerged in 2025-2026[8].
Articles and Resources
References
- ↑ 1.0 1.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 中煤新集毛集电厂2×660MW煤电一体化工程项目获批, Beijixing, June 17, 2022
- ↑ 2×660MW煤电!安徽毛集实验区“风光火储”多能互补一体化项目签约, Beijixing, May 25, 2022
- ↑ 皖发改能源〔2022〕633号, Anhui Province Approvals, 2022-11-17
- ↑ "中煤新集毛集电厂EIA受理公示". 北极星电力网. 2023-06-29. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "毛集电厂EIA报告通过". 微信公众平台. 2023-08-11. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "新集能源暂无建设毛集电厂计划". 微信公众平台. 2024-12-28. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "毛集电厂无复工消息". 北极星电力网. 2026-05-08. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
