Maragondon-Naic-Tanza 2 Solar Power Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Maragondon-Naic-Tanza 2 Solar Power Project is a solar photovoltaic (PV) farm in pre-construction in Naic, Cavite Province, Philippines.

Project Details

Table 1: Phase-level project details for Maragondon-Naic-Tanza 2 Solar Power Project

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2025 (planned)[1] 160 MWp/dc[2] PV[2] Solar Philippines Commercial Rooftop Projects INC[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Maragondon-Naic-Tanza 2 Solar Power Project

Location Coordinates (WGS 84)
Naic, Cavite Province, Philippines[2] 14.3318, 120.7703 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://www.power-technology.com/uncategorized/power-plant-profile-maragondon-naic-tanza-2-solar-power-project-philippines/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 (PDF) https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf?withshield=1. {{cite web}}: Missing or empty |title= (help)