Marathon County Pumped hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Marathon County Pumped hydroelectric plant is an announced hydroelectric power plant in Wisconsin, United States.
Project Details
Table 1: Project details for Marathon County Pumped hydroelectric plant
| Status | Nameplate capacity | Turbines | Technology type | Owner |
|---|---|---|---|---|
| Announced[1] | 1000 MW[1] | 3 x 333 MW[2] | Pumped storage[1] | BOST2 Hydroelectric LLC[2] |
Location
Table 2: Location details for Marathon County Pumped hydroelectric plant
| Location | Coordinates (WGS 84) |
|---|---|
| Wisconsin, United States[2] | 44.8912, -89.3398 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://www.ferc.gov/sites/default/files/2024-12/ActivePrelimPermits_12.10.2024.xlsx.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 "BOST2 Hydroelectric, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications". Federal Register. 2023-03-30. Archived from the original on 2025-01-07. Retrieved 2024-12-20.
