Marsyangdi Besi hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Other names: Marsyangdi Bensi

Marsyangdi Besi hydroelectric plant is a hydroelectric power plant under construction in Besisahar Municipality, Lamjung District, Gandaki Zone, Gandaki Province, Nepal.

Project Details

Table 1: Project details for Marsyangdi Besi hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Owner Operator
Construction[1] 2026[2] 50 MW[1] 2 x 25 MW[1] API Power CO Pvt Ltd[3] Shree Divya Jyoti Hydropower[3]

Location

Table 2: Location details for Marsyangdi Besi hydroelectric plant

Location River Coordinates (WGS 84)
Besisahar Municipality, Lamjung District, Gandaki Zone, Gandaki Province, Nepal[4] Marsyangdi River[5] 28.2333, 84.3826 (approximate)[4]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://www.investopaper.com/news/marsyangdi-besi-hydropower-project/. {{cite web}}: Missing or empty |title= (help)
  2. https://www.power-technology.com/data-insights/power-plant-profile-marsyangdi-besi-nepal/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.sharesansar.com/newsdetail/api-power-company-to-acquire-marsyangdi-besi-hydropower-project-2025-08-13. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06. {{cite web}}: Missing or empty |title= (help)
  5. https://nwrmap.info/hydropower/marsyangdi-besi. {{cite web}}: Missing or empty |title= (help)