Mathillo Balephi hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Upper Balephi, Upper Balefhi
Mathillo Balephi hydroelectric plant is a hydroelectric power plant under construction in Selang Ward, Jugal Rural Municipality, Sindhupalchok District, Bagmati Province, Nepal.
Project Details
Table 1: Project details for Mathillo Balephi hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Technology type | Owner | Operator |
|---|---|---|---|---|---|
| Construction[1][2] | 2027 (planned)[1] | 46 MW[3] | Run-of-river[3] | Upper Balephi Hydropower Ltd[1] | Upper Balephi Hydropower[3] |
Location
Table 2: Location details for Mathillo Balephi hydroelectric plant
| Location | Coordinates (WGS 84) |
|---|---|
| Selang Ward, Jugal Rural Municipality, Sindhupalchok District, Bagmati Province, Nepal[3] | 27.6528, 85.3933 (approximate)[3] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 (PDF) https://www.careratingsnepal.com/upload/CompanyFiles/PR/202509080951_Upper_Balephi_Hydropower_Limited_-_Bank_Facilities_Ratings_Reaffirmed.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20221022054009/http://www.doed.gov.np/license/66. Archived from the original on 2022-10-22.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://www.investopaper.com/news/upper-balephi-hydropower-project/.
{{cite web}}: Missing or empty|title=(help)
