McGinness Hills 3 geothermal plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
McGinness Hills 3 geothermal plant is a 70 MW operating geothermal power plant in Lander County, Nevada, United States.
Project Details
Table 1: Unit-level project details for McGinness Hills 3 geothermal plant
Unit Name | Status | Commissioning Year | Nameplate Capacity | Type | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2018[2] | 48 MW[2] | Binary cycle[3] | Ormat Technology INC[2] |
Location
Table 2: Unit-level location details for McGinness Hills 3 geothermal plant
Unit Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Lander County, Nevada, United States[4] | 39.5933, -116.9126 (exact)[4] |
The map below shows the exact location of the geothermal power plant:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ "48 MW McGinness Hills Phase 3 geothermal plant starts operation in Nevada". Think Geoenergy. December 20, 2018. Archived from the original on May 11, 2022. Retrieved July 13, 2022.
- ↑ 2.0 2.1 2.2 "Completion of McGinness Hills geothermal plant complex expansion". Think Geoenergy. June 7, 2021. Archived from the original on May 11, 2022. Retrieved July 13, 2022.
- ↑ "Global Geothermal Power Plant Map". Think Geoenergy. January 10, 2012. Archived from the original on March 7, 2022. Retrieved July 13, 2022.
- ↑ 4.0 4.1 https://goo.gl/maps/ab9xmeMsd1VRsf1J8.
{{cite web}}
: Missing or empty|title=
(help)