Mempawah SGAR power station is a power station in the pre-permit stage in Mempawah, West Kalimantan, Kalimantan, Indonesia.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Mempawah SGAR power station Mempawah, West Kalimantan, Kalimantan, Indonesia 0.3645579291426721, 108.95567809953518 (approximate)[1]
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Pre-permit[2] coal: unknown[2] 200[1] unknown 2028 (planned)[1] False
Unit 2 Pre-permit[2] coal: unknown[2] 200[1] unknown 2028 (planned)[1] False
Unit 3 Pre-permit[2] coal: unknown[2] 200[1] unknown 2028 (planned)[1] False
Unit 4 Pre-permit[2] coal: unknown[2] 200[1] unknown 2028 (planned)[1] False
Unit 5 Pre-permit[2] coal: unknown[2] 200[1] unknown 2028 (planned)[1] False
Unit 6 Pre-permit[2] coal: unknown[2] 200[1] unknown 2028 (planned)[1] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 PT Bukit Asam Tbk [100%][2] PT Bukit Asam Tbk [100.0%]
Unit 2 PT Bukit Asam Tbk [100%][2] PT Bukit Asam Tbk [100.0%]
Unit 3 PT Bukit Asam Tbk [100%][2] PT Bukit Asam Tbk [100.0%]
Unit 4 PT Bukit Asam Tbk [100%][2] PT Bukit Asam Tbk [100.0%]
Unit 5 PT Bukit Asam Tbk [100%][2] PT Bukit Asam Tbk [100.0%]
Unit 6 PT Bukit Asam Tbk [100%][2] PT Bukit Asam Tbk [100.0%]

Project-level captive use details

  • Captive industry: Aluminum[1]


Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

PT Indonesia Asahan Aluminum (INALUM) began construction on Smelter Grade Alumina Refinery (SGAR) in Mempawah Regency in 2020. The first phase was designed to process bauxite ore mineral resources from West Kalimantan.[3]

As of December 2025, a Phase II of SGAR was in development. The second phase was planned to include a 6 x 200 MW captive coal-fired power station. The units would reportedly be built by a third party and were slated to begin operating in 2028.[4]

In April 2026, PT Bukit Asam (PTBA), a subsidiary of INALUM, was seeking a construction partner for Mempawah SGAR power station. There were reportedly candidates from China, South Korea, and Japan. The power station was targeted to start construction in 2027.[5] The Director of Downstreaming and Product Diversification at PTBA stated (Google translate): "For Mempawah, we've locked in the coal market, 6.9 million tons per year. We've locked in for 30 years. Going forward, we'll ensure a market for coal for 30 years."[6]

Financing

In December 2025, Inalum stated that it would not build the power plant itself, and that the plant would be developed through cooperation with a third-party partner selected through tender, with Inalum purchasing electricity from the project.[4] In April 2026, PT Bukit Asam Tbk (PTBA) was seeking partners to build the Mempawah power plant.[5] No project-specific financier, lender, debt-equity structure or financing amount had been disclosed.

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 https://news.metal.com/newscontent/103681845-Mempawah-Alumina-Refinerys-Six-200MW-Units-Set-for-2028-Launch-to-Support-Phase-II-Project. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 https://danantaramonitor.org/bukit-asam-seeks-partner-to-build-power-plant-in-mempawah-to-start-construction-in-2027/. {{cite web}}: Missing or empty |title= (help)
  3. ↑ The Facts of SGAR Mempawah, PT Indonesia Asahan Aluminium, accessed June 16, 2026
  4. ↑ 4.0 4.1 Mempawah Alumina Refinery's Six 200MW Units Set for 2028 Launch to Support Phase II Project, SMM Metal, December 20, 2025
  5. ↑ 5.0 5.1 Bukit Asam Seeks Partner to Build Power Plant in Mempawah, to Start Construction in 2027, Danantara Monitor, April 14, 2026
  6. ↑ PTBA Targetkan Pengerjaan Fisik PLTU Mempawah Mulai Awal Tahun 2027, Dunia Energi, April 6, 2026

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.