Menengai 2 geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Menengai 2 geothermal power plant is a geothermal power plant in pre-construction in Nakuru North, Nakuru, Kenya.
Project Details
Table 1: Unit-level project details for Menengai 2 geothermal power plant
Status | Nameplate Capacity | Type | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 60 MW[1] | Flash steam - unknown[1] | Geothermal Development Company (GDC)[1] | Geothermal Development Company (GDC)[1] |
Location
Table 2: Unit-level location details for Menengai 2 geothermal power plant
Unit Name | Location | Coordinates (WGS 84) |
---|---|---|
Nakuru North, Nakuru, Kenya[2] | -0.1960, 36.0630 (exact)[2] |
The map below shows the exact location of the geothermal power plant:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "GDC- Geothermal Development Company". GDC. Archived from the original on May 11, 2022. Retrieved July 13, 2022.
- ↑ 2.0 2.1 "Menengai II Geothermal Power Station". Google Maps. Archived from the original on May 12, 2022. Retrieved July 13, 2022.