Menengai 2 geothermal power plant is a geothermal power plant in pre-construction in Nakuru North, Nakuru, Kenya.


Project Details

Table 1: Unit-level project details for Menengai 2 geothermal power plant

Status Nameplate Capacity Type Owner Operator
Pre-construction[1] 60 MW[1] Flash steam - unknown[1] Geothermal Development Company (GDC)[1] Geothermal Development Company (GDC)[1]


Location

Table 2: Unit-level location details for Menengai 2 geothermal power plant

Unit Name Location Coordinates (WGS 84)
Nakuru North, Nakuru, Kenya[2] -0.1960, 36.0630 (exact)[2]

The map below shows the exact location of the geothermal power plant:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 "GDC- Geothermal Development Company". GDC. Archived from the original on May 11, 2022. Retrieved July 13, 2022.
  2. 2.0 2.1 "Menengai II Geothermal Power Station". Google Maps. Archived from the original on May 12, 2022. Retrieved July 13, 2022.