Mengtai Beijiao power station (蒙泰东胜北骄热电厂) is an operating power station of at least 1980-megawatts (MW) in Dongsheng, Ordos, Inner Mongolia, China. It is also known as Mengtai Dongsheng power station; 蒙泰东胜热电一期 (Unit 1, Unit 2), 蒙泰东胜北骄热电一厂 (Unit 1, Unit 2), 蒙泰东胜北骄热电二厂 (Unit 3, Unit 4), 蒙泰东胜热电二期 (Unit 3, Unit 4), 蒙泰北源热电联产项目 (Unit 3, Unit 4).
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Mengtai Beijiao power station | Dongsheng, Ordos, Inner Mongolia, China | 39.846544, 109.984433 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 39.846544, 109.984433
- Unit 3, Unit 4: 39.846004, 109.984888
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Unit 1 | operating | coal - waste coal | 330 | subcritical | 2015 | – |
Unit 2 | operating | coal - waste coal | 330 | subcritical | 2015 | – |
Unit 3 | operating | coal - waste coal | 660 | subcritical | 2022 | – |
Unit 4 | operating[1] | coal - waste coal | 660 | supercritical | 2023[1] | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Unit 1 | Ordos Beijiao Thermal Power Co Ltd [100.0%] |
Unit 2 | Ordos Beijiao Thermal Power Co Ltd [100.0%] |
Unit 3 | Ordos Beijiao Thermal Power Co Ltd [100.0%] |
Unit 4 | Ordos Beijiao Thermal Power Co Ltd [100.0%] |
Project-level coal details
- Permit(s): August 22, 2015, May 8, 2020
Background on Project
Mengtai Coal Power Group has been permitted to build a 2 x 330 MW coal plant in Dongsheng District. Coal supply would be domestic.[2][3]
The units were completed in 2015.[4]
Expansion
Two additional 330 MW subcritical coal units began preliminary construction near the power station in 2018,[5] although they do not have a permit for construction.[6]
In May 2020, the project was permitted as 2 x 660 MW coal-fired units.[7] Construction began in August 2020.[8]
Unit 3 went into operation in December 2022.[9]
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240125130931/https://www.cpnn.com.cn/qiye/guanli/202301/t20230113_1578723.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "内蒙古核准17个火电项," 北极星电力网新闻中心, 2015/9/6
- ↑ "蒙泰东胜2×330MW低热值煤热电联产项目环境影响评价公众参与首次公示," 2014-01-16
- ↑ "关于鄂尔多斯市蒙泰东胜热电联产低热值煤发电项目核准的批复 信息来源," 2015-09-01
- ↑ "鄂尔多斯市北骄热电有限责任公司," Mengtai Coal Power Group, accessed Jan 2018
- ↑ "内蒙古发布环保违规建设项目3050个," H2O China, 2016-12-19
- ↑ "蒙泰东胜二期2×66万千瓦热电联产项目获得核准," 北极星电力网新闻中心, 2020/5/15
- ↑ "中国能建西北院设计蒙泰东胜二期热电联产项目开工," China5e, 2020-08-06