Meridiana wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Meridiana wind farm (Parque eólico Meridiana) is a wind farm in pre-construction in Alberuela de Tubo, Huesca, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Meridiana wind farm
Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 28 MW[2] | Onshore[2] | Forestalia SL [100%][3] | Energía Inagotable de Meridiana[2] |
Location
Table 2: Phase-level location details for Meridiana wind farm
Location | Coordinates (WGS 84) |
---|---|
Alberuela de Tubo, Huesca, Aragón, Spain[2] | 41.8882, -0.2382 (approximate)[2] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-4270 https://energiaestrategica.es/forestalia-de-nuevo-a-la-cabeza-mas-de-12-gw-renovables-avanzan-en-tramitacion-ambiental/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-4270.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 "BOE-A-2024-4270 Resolución de 27 de noviembre de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Energía Inagotable de Meridiana, SL, autorización administrativa previa para el parque eólico Meridiana, de 28 MW, en Alberuela de Tubo, Lalueza, Huerto, Grañén y Tramaced (Huesca)". Boletín Oficial del Estado. 2024-03-04. Archived from the original on 2024-04-09. Retrieved 2024-04-04.
- ↑ "Forestalia de nuevo a la cabeza: Más de 1,2 GW renovables avanzan en tramitación ambiental". Energía Estratégica España. 2024-03-08. Archived from the original on 2024-04-13. Retrieved 2024-04-03.