Metallurgical Cluster Gallaaral steel plant
From Global Energy Monitor
(Redirected from Metallurgical Cluster Gallaaral)
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Metallurgical Cluster Gallaaral steel plant (Металлургический кластер Галлаарал, G’allaorol metallurgiya klasteri) is a steel plant in Gallaaral district, Jizzakh region, Uzbekistan that operates electric arc furnace (EAF) technology.
Location
The map below shows the approximate location of the plant in Gallaaral district, Jizzakh region, Uzbekistan:
- Location: Special Industrial Zone "G'allaorol"
- Coordinates (WGS 84): 40.012819, 67.573496 (approximate)
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Start date | Workforce size |
|---|---|---|
| 2018[1] | 2026[2][3] | 2000[4][3] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Triangul Metals Tebinbulak JSC [100.0%] | unknown [100.0%] | E100001012111 [100.0%] | Triangul Metals Tebinbulak JSC [100%][3] | unknown | E100001012111 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
|---|---|---|---|---|---|
| semi-finished, finished rolled[3] | bloom, rolled wire rod, rebar, grinding balls, square bars, corners, schweelte, sections, annealed coils and sheets, galvanized coils and sheets, coils and sheets with polymer coating[3] | unknown | unknown | unknown | EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| announced | 1500[3][5] | 1500[3][5] |
Unit Details
Table 5: Electric Arc Furnace Details
| Unit name | Status | Announced date | Start date | Current capacity (ttpa) |
|---|---|---|---|---|
| unknown EAF (1) | announced[5][3] | 2018[1] | 2026[3] | 1500[5][3] |
Table 6: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI |
|---|---|---|---|
| unknown EAF (1) | no[3] | 0 | 100.00[3][5] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://uz.sputniknews.ru/20201127/Stroitelstvo-GMK-v-Karakalpakstane-na-kakom-etape-seychas-proekt-15486965.html.
{{cite web}}: Missing or empty|title=(help) - ↑ https://gov.uz/oz/jizzax/news/view/29601.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 https://web.archive.org/web/20240912175144/https://www.triangulmetals.com/en. Archived from the original on 2024-09-12.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.gazeta.uz/ru/2024/02/26/beeline-uzbekistan/.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 5.4 https://web.archive.org/web/20240718085220/https://www.triangulmetals.com/en.
{{cite web}}: Missing or empty|title=(help)
