Milford Wind Corridor wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Milford Wind Corridor wind farm is an operating wind farm in Beaver County, Utah, United States.

Project Details

Table 1: Phase-level project details for Milford Wind Corridor wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2009[1] 204 MW[2] Onshore[2] Longroad Energy [100%][3] Longroad Energy[4]
2 Operating[1] 2011[1] 102 MW[2] Onshore[2] Longroad Energy [100%][3] Longroad Energy[4]
3 Cancelled[5] – 100 MW[2] Onshore[2] Longroad Energy [100%][1] –

Location

Table 2: Phase-level location details for Milford Wind Corridor wind farm

Phase Name Location Coordinates (WGS 84)
1 Beaver County, Utah, United States[2] 38.5315, -112.9230 (exact)[2]
2 Millard County, Utah, United States[2] 38.5982, -112.8990 (exact)[2]
3 Millard County, Utah, United States[2] 38.5982, -112.8990 (approximate)[2]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  2. ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.{{cite web}}: CS1 maint: multiple names: authors list (link)
  3. ↑ 3.0 3.1 https://web.archive.org/web/20240131101006/https://www.longroadenergy.com/renewable-energy-projects/. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 https://web.archive.org/web/20240131021101/https://www.spglobal.com/usercontrols/articlecontent.aspx?acp=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. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  5. ↑ "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.