Mingecevir power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Mingecevir power station (Mingəçevir ES) is a power station under construction in Mingecevir, Yevlakh district, Azerbaijan.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Mingecevir power station | Mingecevir, Yevlakh district, Azerbaijan | 40.78103, 46.99087 (exact)[1][2][3] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 40.78103, 46.99087
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1 | construction[4][3] | gas[2] | 320[2] | gas turbine[2] | yes[5] | 2025[4] | – |
Unit 2 | construction[4][3] | gas[2] | 320[2] | gas turbine[2] | yes[6] | 2025[4] | – |
Unit 3 | construction[4][3] | gas[2] | 320[2] | gas turbine[2] | yes[7] | 2025[4] | – |
Unit 4 | construction[4][3] | gas[2] | 320[2] | gas turbine[2] | yes[8] | 2025[4] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | AzərEnerji OJSC[2] | AzərEnerji OJSC [100.0%] |
Unit 2 | AzərEnerji OJSC[2] | AzərEnerji OJSC [100.0%] |
Unit 3 | AzərEnerji OJSC[2] | AzərEnerji OJSC [100.0%] |
Unit 4 | AzərEnerji OJSC[2] | AzərEnerji OJSC [100.0%] |
Background
The construction of the power station began in February 2023 on the territory of the Azerbaijan Thermal Power Plant at the premises of steam turbine units 7 and 8.[9][10] AzerEnerji singed a contract with Italian Ansaldo Energia for the delivery and installation of four AE94.3A gas turbines for the amount EUR 160 million.[10] As of March 2024, the construction is 90-95% complete, and the power station is expected to be commissioned by the end of 2024.[11]
As a result of connecting the new power station and units 7 and 8 of the Azerbaijan Thermal Power Plant (TPP), the total capacity of the energy unit will reach 1,880 MW increasing the efficiency coefficient from 18% to 56%. The exhaust gas from the Mingecevir power station will be utilized to convert water into steam, allowing energy to be obtained without additional gas processing in the steam turbines units 7 and 8 of the Azerbaijan TPP, thus, saving 800 million cubic meters of gas per year.[11]
Articles and Resources
References
- ↑ https://goo.gl/maps/mEJ8qgNifdbJ3HFv9?coh=178573&entry=tt.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 https://web.archive.org/web/20230315002104/http://interfax.az/view/886605. Archived from the original on 15 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20230811002709/https://az.sputniknews.ru/20230809/kak-v-azerbaydzhane-stroitsya-krupneyshaya-elektrostantsiya-457556544.html. Archived from the original on 11 August 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20230214061634/http://interfax.az/view/886568. Archived from the original on 14 February 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230214061634/http://interfax.az/view/886568. Archived from the original on 14 February 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230214060732/http://interfax.az/view/886569. Archived from the original on 14 February 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://interfax.az/view/886570.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230214062111/http://interfax.az/view/886571. Archived from the original on 14 February 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Как в Азербайджане строится крупнейшая электростанция". Sputnik Azerbaijan. August 9, 2023. Retrieved September 18, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 10.0 10.1 "Запуск новой ТЭС в Мингячевире позволит Азербайджану экономить до 1 млрд м3/год природного газа". neftegaz.ru. February 13, 2023. Retrieved March 21, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 11.0 11.1 "К концу 2024 года в Мингячевире будет введена в эксплуатацию новая электростанция". report.az. Ocotber 19, 2023. Retrieved March 21, 2024.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.