Minzhu Cogen power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Minzhu Cogen power station (哈尔滨华越热电公司民主热电厂) is a shelved power station in Daowai, Harbin, Heilongjiang, China. It is also known as Harbin Huayue cogen power station, 华能热源厂整体搬迁替代工程.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Minzhu Cogen power station Daowai, Harbin, Heilongjiang, China 45.835264, 126.751667 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4: 45.835264, 126.751667

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 shelved coal - unknown 80 unknown
Unit 2 shelved coal - unknown 80 unknown
Unit 3 shelved coal - unknown 80 unknown
Unit 4 shelved coal - unknown 80 unknown

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Harbin Huayue Thermal Power Co Ltd [100.0%]
Unit 2 Harbin Huayue Thermal Power Co Ltd [100.0%]
Unit 3 Harbin Huayue Thermal Power Co Ltd [100.0%]
Unit 4 Harbin Huayue Thermal Power Co Ltd [100.0%]

Project-level coal details

  • Permit(s): July 6, 2020

Background

The Minzhu Cogeneration power station is a permitted 320 MW coal-fired power plant in Heilongjiang province. Approved in July 2020, the project was expected to involved total investment of 4.1 billion RMB (635 thousand USD) and to be completed by October 2023.[1] It will provide both electricity and heating to the area; the maximum heating capacity can meet the demand of 45 million square meters of buildings in the district of Daoli and Daowai. The plant is supposed to be fitted with desulfurization, denitrification, and dust removal technologies during construction as well.[2]

Construction for the plant was meant to begin in October 2020.[1] The Harbin Group put out several bids for construction-related tasks; in September 2020, the project was beginning a preliminary design stage with the China Energy Construction Group Heilongjiang Electric Power Design Institute Co., Ltd.[3] However, there is still no confirmation that construction has begun.

With no known developments on the project in recent years, the power station was presumed shelved as of January 2023.

Articles and Resources

References

  1. 1.0 1.1 "哈尔滨市民主热电项目(热电厂)建筑及安装工程监理招标公告_哈尔滨华越热电有限责任公司_招标详情 - 交通公路招标采购网". www.122bid.com (in 中文(中国大陆)). 2020-09-19. Retrieved 2021-07-29.{{cite web}}: CS1 maint: url-status (link)
  2. "哈尔滨市民主热电项目获核准批复". hlj.sina.com.cn. 2020-07-11. Retrieved 2021-07-29.{{cite web}}: CS1 maint: url-status (link)
  3. "哈尔滨民主热电项目-工程招标-拟在建-中国招标与采购网". www.zbytb.com. 2021-07-09. Retrieved 2021-07-29.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.