Mmadinare Solar Complex
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Mmadinare Solar Complex is an operating solar photovoltaic (PV) farm in Mmadinare, Botswana.
Project Details
Table 1: Phase-level project details for Mmadinare Solar Complex
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|---|
| 1 | Operating[1] | 2025[2] | 60 MWp/dc[3] | PV[4] | Scatec ASA [100%] (سكاتك)[3] | Scatec (سكاتك)[3] |
| 2 | Operating[5] | 2026[5] | 60 MWp/dc[3] | PV[4] | Scatec ASA [100%] (سكاتك)[3] | Scatec (سكاتك)[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Mmadinare Solar Complex
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Mmadinare, Botswana[6] | -21.8813, 27.7485 (approximate)[6] |
| 2 | Mmadinare, Botswana[6] | -21.8813, 27.7485 (approximate)[6] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://renewablesnow.com/news/scatec-switches-on-60-mw-solar-farm-in-botswana-1272219/?utm_campaign=daily-newsletter-by-renewables-now&utm_medium=email&utm_edition=202503130430&utm_source=newsletter.
{{cite web}}: Missing or empty|title=(help) - ↑ https://scatec.com/2025/03/12/scatec-starts-commercial-operation-of-solar-power-plant-in-botswana/.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "Scatec prepares for Botswana solar plant construction after reaching financial close". Scatec. 2023-12-15. Archived from the original on 2024-07-11. Retrieved 2024-07-05.
- ↑ 4.0 4.1 "NEWS 29 MARCH 2024 BOTSWANA: work starts on the country's largest solar farm at Mmadinare". 2024-03-29. Archived from the original on 2024-07-11. Retrieved 2024-07-05.
- ↑ 5.0 5.1 https://solarquarter.com/2026/01/12/scatec-starts-commercial-operation-of-second-60-mw-phase-of-botswanas-120-mw-mmadinare-solar-cluster/.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 6.3 https://maps.app.goo.gl/P8bdVxFEZaRjeLnE9 https://scatec.com/2023/12/15/scatec-prepares-for-botswana-solar-plant-construction-after-reaching-financial-close/, https://maps.app.goo.gl/P8bdVxFEZaRjeLnE9.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
