Mount Coffee solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Mount Coffee solar farm is an announced solar photovoltaic (PV) farm in Careysburg, Montserrado County, Liberia.
Project Details
Table 1: Phase-level project details for Mount Coffee solar farm
| Phase name | Status | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|
| 1 | Construction[1] | 20 MWp/dc[2] | PV[3] | Gigawatt Global [100%][2] | Gigawatt Global[2] |
| 2 | Announced[4] | 40 MWp/dc[5] | PV[5] | – | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Mount Coffee solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Careysburg, Montserrado County, Liberia[6] | 6.4745, -10.6482 (exact)[6] |
| 2 | Careysburg, Montserrado County, Liberia[7] | 6.4745, -10.6482 (exact)[7] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.pv-magazine.com/2024/10/16/liberia-breaks-ground-on-first-utility-scale-solar-plant/ https://www.facebook.com/liberiaec/videos/president-joseph-nyuma-boakai-sr-breaks-ground-at-mt-coffee-for-liberias-first-e/1258269285308276/, https://www.pv-magazine.com/2024/10/16/liberia-breaks-ground-on-first-utility-scale-solar-plant/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220324160652/https://www.slrconsulting.com/en/public-documents/GWG-Liberia. Archived from the original on 24 March 2022.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20221130165141/https://repp.energy/project/mount-coffee-solar-farm/. Archived from the original on 30 November 2022.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240207084911/https://www.afrik21.africa/en/liberia-the-world-bank-pledges-96-million-for-a-60-mwp-solar-power-plant/. Archived from the original on 2024-02-07.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240201084612/https://allafrica.com/stories/202302010220.html. Archived from the original on 2024-02-01.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 https://www.slrconsulting.com/en/public-documents/GWG-Liberia https://maps.app.goo.gl/WXzb6EVvgWZZx7hb8, https://www.slrconsulting.com/en/public-documents/GWG-Liberia.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 7.0 7.1 https://www.slrconsulting.com/en/public-documents/GWG-Liberia, https://www.afrik21.africa/en/liberia-the-world-bank-pledges-96-million-for-a-60-mwp-solar-power-plant/ https://maps.app.goo.gl/WXzb6EVvgWZZx7hb8, https://www.slrconsulting.com/en/public-documents/GWG-Liberia, https://www.afrik21.africa/en/liberia-the-world-bank-pledges-96-million-for-a-60-mwp-solar-power-plant/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
