Mousyite Florina I solar project
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Mousyite Florina I solar project (Μουσγητε Τεμ. 1185-1157) is an operating solar photovoltaic (PV) farm in Florina Municipal Unit, Florina Regional Unit, Epirus and Western Macedonia, Greece.
Project Details
Table 1: Phase-level project details for Mousyite Florina I solar project
| Status | Commissioning year | Nameplate capacity | Technology |
|---|---|---|---|
| Operating[1] | 2022[1] | 1 MWp/dc[1] | PV[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Mousyite Florina I solar project
| Location | Coordinates (WGS 84) |
|---|---|
| Florina Municipal Unit, Florina Regional Unit, Epirus and Western Macedonia, Greece[1] | 40.8190, 21.4579 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help)
