Mudanjiang Cogen power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Mudanjiang Cogen power station (牡丹江热电厂) is an operating power station of at least 180-megawatts (MW) in Dong'an District, Mudanjiang, Heilongjiang, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Mudanjiang Cogen power station | Dong'an District, Mudanjiang, Heilongjiang, China | 44.569754, 129.631722 (exact) |
Unit-level coordinates (WGS 84):
- Unit 5, Unit 6: 44.569754, 129.631722
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Unit 5 | Operating | coal: unknown[1] | 80 | unknown | yes | – | False |
| Unit 6 | Operating[2] | coal: unknown[2][1] | 100[2] | unknown | yes | 2026[2] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 5 | Mudanjiang Thermal Power Co Ltd [100%][2] | Mudanjiang Thermal Power Co Ltd [100.0%] |
| Unit 6 | Mudanjiang Thermal Power Co Ltd [100%][2] | Mudanjiang Thermal Power Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Mudanjiang Cogeneration power station (not to be confused with the Mudanjiang-2 power station) consists of an 80 MW coal unit that was likely commissioned in the early 2010s. The plant provides an estimated 65% of the city's central heating. In 2015, it was fitted with a new desulfurization unit.[3]
A new 100 MW unit was permitted in May 2020. Construction began on the unit before it was permitted.[4] The Mudanjiang Cogen Power Company has invested 348.4 million RMB into the expansion project. Coal for the plant is transported via a railway that runs through the plant and the eastern party of Mudanjiang city.[5]
The unit passed its 168-hour trial run in January 2026.[6]
Articles and Resources
References
- ↑ 1.0 1.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://mp.weixin.qq.com/s/tGcNZ2hTvr2NR_fhnUAiww.
{{cite web}}: Missing or empty|title=(help) - ↑ "牡丹江热电有限公司脱硫工程_北京国能中电节能环保技术股份有限公司". CPCEP. Retrieved 2021-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "黑龙江省发改委核准4个热电联产项目 - 热电联产_北极星电力新闻网". news.bjx.com.cn. 2020-06-28. Retrieved 2021-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "环境影响报告书" (PDF). http://sthj.hlj.gov.cn/. 2020-07-09. Retrieved 2021-07-29.
{{cite web}}: External link in(help)CS1 maint: url-status (link)|website= - ↑ "牡丹江热电有限公司1×100MW背压机组扩建工程顺利通过168小时试运行". WeChat. 2026-01-11. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
