NLC Hybrid SECI IV wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

NLC Hybrid SECI IV wind farm is a wind farm under construction in Tamil Nadu, India.

Project Details

Table 1: Phase-level project details for NLC Hybrid SECI IV wind farm

Status Commissioning year Nameplate capacity Type Owner
Construction[1] 2025 (planned)[2] 50 MW[1] Onshore[3] Neyveli Lignite Corporation (NLC) India Ltd [100%][4]

Location

Table 2: Phase-level location details for NLC Hybrid SECI IV wind farm

Location Coordinates (WGS 84)
Tamil Nadu, India[4] 11.3198, 78.3030 (approximate)[4]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://cea.nic.in/wp-content/uploads/rpm_division/2023/11/Report_On_Under_Construction_Renewable_Energy_Projects___Final_for_October_2023.pdf. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://cea.nic.in/wp-content/uploads/rpm_division/2024/11/Report_on_Under_Construction_and_Under_Develoment_Projects_all_across_the_Country_September_2024.pdf. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20240126114024/https://www.seci.co.in/Upload/Tender/SECI000047-2648427-StandardSECI-HPDPPA_1200MWT4_finalupload.pdf. Archived from the original (PDF) on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 (PDF) https://web.archive.org/web/20240126071022/https://www.seci.co.in/upload/Bidder/637794049268919362.pdf. Archived from the original (PDF) on 2024-01-26. {{cite web}}: Missing or empty |title= (help)