NTEC Gas power plant

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

NTEC Gas power plant is a power station in pre-construction in San Juan, New Mexico, United States.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
NTEC Gas power plant San Juan, New Mexico, United States 36.682944, -108.4502 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • GEN1, GEN10, GEN11, GEN12, GEN13, GEN14, GEN15, GEN16, GEN17, GEN18, GEN2, GEN3, GEN4, GEN5, GEN6, GEN7, GEN8, GEN9: 36.682944, -108.4502

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
GEN1 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN10 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN11 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN12 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN13 Pre-construction[2][1] fossil gas: natural gas[1] 41.4[1] gas turbine[2][1] 2028 (planned)[1]
GEN14 Pre-construction[2][1] fossil gas: natural gas[1] 41.4[1] gas turbine[2][1] 2028 (planned)[1]
GEN15 Pre-construction[2][1] fossil gas: natural gas[1] 41.4[1] gas turbine[2][1] 2028 (planned)[1]
GEN16 Pre-construction[2][1] fossil gas: natural gas[1] 41.4[1] gas turbine[2][1] 2028 (planned)[1]
GEN17 Pre-construction[2][1] fossil gas: natural gas[1] 41.4[1] gas turbine[2][1] 2028 (planned)[1]
GEN18 Pre-construction[2][1] fossil gas: natural gas[1] 41.4[1] gas turbine[2][1] 2028 (planned)[1]
GEN2 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN3 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN4 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN5 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN6 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN7 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN8 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]
GEN9 Pre-construction[2][1] fossil gas: natural gas[1] 60.5[1] gas turbine[2][1] 2027 (planned)[1]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
GEN1 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN10 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN11 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN12 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN13 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN14 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN15 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN16 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN17 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN18 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN2 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN3 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN4 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN5 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN6 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN7 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN8 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC
GEN9 Navajo Transitional Energy Company LLC[2] Navajo Transitional Energy Company LLC

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 1.53 1.54 1.55 1.56 1.57 1.58 1.59 1.60 1.61 1.62 1.63 1.64 1.65 1.66 1.67 1.68 1.69 1.70 1.71 1.72 1.73 1.74 1.75 1.76 1.77 1.78 1.79 1.80 1.81 1.82 1.83 1.84 1.85 1.86 1.87 1.88 1.89 1.90 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 2.34 2.35 2.36 2.37 2.38 2.39 2.40 2.41 2.42 2.43 2.44 2.45 2.46 2.47 2.48 2.49 2.50 2.51 2.52 2.53 (PDF) https://downloads.regulations.gov/EPA-R09-OAR-2024-0028-0001/content.pdf. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.