Naco Nogales power station

From Global Energy Monitor

[español]

Part of the Global Gas Plant Tracker, a Global Energy Monitor and Center for Media and Democracy project.

Naco Nogales power station (Central CC Naco Nogales) is a 350-megawatt (MW) gas-fired power station in the state of Sonora, Mexico.

Location

The map below shows the exact location of the power station in Agua Prieta, the state of Sonora, Mexico.

Loading map...

Project Details

  • Sponsor: Fuerza y Energía de Naco Nogales, S.A. de C.V.
  • Parent company: Naturgy Energy Group SA[1]
  • Location: Agua Prieta, Sonora, Mexico
  • Coordinates: 31.2222, -109.6081 (exact)[2]
  • Gross generating capacity (operating): 350 MW
    • Unit auto-gen: Gas-fired[3] combined cycle[4], 50 MW[4] (start-up in 2013)[3]
    • Unit I: Gas-fired[2] combined cycle[5], 300 MW[6] (start-up in 2003)[7]

Articles and Resources

References

  1. "Informe Financiero Anual Consolidado 2019" (PDF). Naturgy. Archived (PDF) from the original on May 12, 2021. Retrieved May 7, 2021.
  2. 2.0 2.1 "PowerPlantsAllGE100MW_NorthAmerica_201708.xlsx". North American Cooperation on Energy Information (NACEI). August 1, 2017. Archived from the original on May 14, 2021. Retrieved May 14, 2021.
  3. 3.0 3.1 "Tabla De Permisos De Generación E Importación De Energía Eléctrica Administrados Al 30 De Abril De 2018" (PDF). SENER (Secretaría de Energía), Gobierno de México. Archived (PDF) from the original on May 10, 2021. Retrieved May 7, 2021.
  4. 4.0 4.1 "PRODESEN 2018-2032: Programa de Desarrollo del Sistema Eléctrico Nacional" (PDF). SENER (Secretaría de Energía). Archived (PDF) from the original on May 12, 2021. Retrieved May 7, 2021.
  5. "PRODESEN 2019-2033: Programa de ampliación de modernización de las redes generales de distribución no correspondientes al Mercado Eléctrico Mayorista" (PDF). Centro Nacional de Control de Energía (CENACE). Archived (PDF) from the original on April 12, 2021. Retrieved May 7, 2021.
  6. "La Central Naco Nogales celebra su 15 Aniversario de Operación Comercial". Global Power. Archived from the original on May 3, 2021. Retrieved May 4, 2021.
  7. "Metodología, Criterios y Términos para Contratos Legados" (PDF). Secretaría de Energía - Subsecretaría de Electricidad - Gobierno de México. August 31, 2017. Archived (PDF) from the original on May 3, 2021. Retrieved May 4, 2021.