Nanning Liujing Cogen power station (南宁市六景工业园区公共热电联产项目) is an operating power station of at least 230-megawatts (MW) in Nanning, Guangxi, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Nanning Liujing Cogen power station | Nanning, Guangxi, China | 22.84279, 108.91005 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1, 2-1, 2-2, Phase I Unit 1, Phase II Unit 2, Phase II Unit 3: 22.84279, 108.91005
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| 1 | Operating[2] | bioenergy: paper mill wastes, bioenergy: wastewater and sewage sludge (solids or biogas)[3] | 80[3] | – | – | 2025[2] | no |
| 2-1 | Operating[4] | bioenergy: paper mill wastes[3] | 50[3] | – | – | 2025[4] | no |
| 2-2 | Operating[4] | bioenergy: paper mill wastes[3] | 50[3] | – | – | 2025[4] | no |
| Phase I Unit 1 | Operating | coal: unknown[1][5] | 50[1] | subcritical[1] | yes | 2024 | no |
| Phase II Unit 2 | Permitted[1] | coal: unknown[1][5] | 50[1] | subcritical[6] | yes | – | no |
| Phase II Unit 3 | Permitted[6] | coal: unknown[1][5] | 50[1] | subcritical[6] | yes[1] | – | no |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | Nanning Sun Paper Co Ltd [100%][3] | Shandong SUN Paper Co Ltd [100.0%] |
| 2-1 | Nanning Sun Paper Co Ltd [100%][3] | Shandong SUN Paper Co Ltd [100.0%] |
| 2-2 | Nanning Sun Paper Co Ltd [100%][3] | Shandong SUN Paper Co Ltd [100.0%] |
| Phase I Unit 1 | Nanning Sun Paper Co Ltd [100%][3] | Shandong SUN Paper Co Ltd [100.0%] |
| Phase II Unit 2 | Nanning Sun Paper Co Ltd [100%][3] | Shandong SUN Paper Co Ltd [100.0%] |
| Phase II Unit 3 | Nanning Sun Paper Co Ltd [100%][3] | Shandong SUN Paper Co Ltd [100.0%] |
Project-level captive use details
Project-level coal details
- Coal source(s): domestic/imported
- Permit(s): 桂发改电力〔2022〕791号[1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The 3 × 50 MW cogen units were reportedly granted permission to build on July 23, 2022, by Guangxi Provincial Development and Reform Commission.[7][8] The three circulating fluidized bed units were to be built in Jingzhou, Nanning Liujing Industrial Park.[7]
Details of the Environmental Impact Assessment were published by the government of Guangxi Zhuang Autonomous Region in November 2022. [9]
Phase I Unit 1
In 2024, documents confirmed that Unit 1 had been under construction since late 2022 and had passed a soil sustainability inspection by April 2024, indicating it was operating.[10][11]
Phase II Units 2 & 3
Tendering for Phase II began in late 2024.[12] An update in March 2026 mentioned the project was being discussed at a local government meeting.[13] Though no further news emerged after that.[14].
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://web.archive.org/web/20240711172309/http://fgw.gxzf.gov.cn/zfxxgkzl/wjzx/xmpf/xiangmuhezhunpifu/t12856710.shtml. Archived from the original on 2024-07-11.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://baijiahao.baidu.com/s?id=1821485900233601333&wfr=spider&for=pc.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 http://sthjt.gxzf.gov.cn/zfxxgk/zfxxgkgl/fdzdgknr/hjjccf/xzxk/hjyxslgk/t13294105.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://sl.nanning.gov.cn/ztzl/stbczl/t6513862.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 "广西壮族自治区生态环境厅关于南宁市六景工业园区公共热电联产项目环境影响报告书的批复 - 环境影响评价管理 - 广西壮族自治区生态环境厅网站". sthjt.gxzf.gov.cn. 2022-11-29. Archived from the original on 2024-01-25. Retrieved 2023-10-16.
- ↑ 7.0 7.1 "南宁市六景工业园区公共热电联产项目获得核准批复". 北极星火力发电网. 2022-08-24. Retrieved 2023-02-06.
{{cite web}}: CS1 maint: url-status (link) - ↑ 广西壮族自治区发展和改革委员会关于南宁市六景工业园区公共热电联产项目核准的批复, 广西壮族自治区发展和改革委员会 2022-07-26
- ↑ 自治区生态环境厅关于南宁太阳纸业有限公司南宁市六景工业园区公共热电联产项目(非辐射类)环境影响报告书审批的公示 广西壮族自治区生态环境厅, 2022-11-18
- ↑ "南宁市行政审批局关于南宁市六景工业园区公共热电联产项目水土保持方案报告书审批准予行政许可的通知". Nanning Municipal Government. 2023-01-12. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "南宁市六景工业园区公共热电联产项目(一期)水土保持设施自主验收报备回执". Nanning Municipal Government. 2024-04-23. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "南宁市六景工业园区公共热电联产项目(二期)-主厂房(二期)、干煤棚(二期)、脱硫综合楼(二期) bidding". XunBiaoBao. 2024-09-27. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "市委书记黄海韬到南宁东部新城六景工业园区开展联系服务重大项目重点企业工作". WeChat. 2026-03-21. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "南宁六景热电二期无新进展". 北极星电力网. 2026-05-16. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Bioenergy Power Tracker and the Global Coal Plant Tracker on the Global Energy Monitor website.