Naumure hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Naumure Storage Project
Naumure hydroelectric plant is an announced hydroelectric power plant in Gugauli Village, Kapilvastu District, Lumbini Zone, Lumbini Province, Nepal.
Project Details
Table 1: Project details for Naumure hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
|---|---|---|---|---|---|
| Announced[1] | 2032 (planned)[2] | 218 MW[3] | 3[2] | Conventional storage[4] | Nepal Electricity Authority (NEA) [100%][5] |
Location
Table 2: Location details for Naumure hydroelectric plant
| Location | River | Complex | Coordinates (WGS 84) |
|---|---|---|---|
| Gugauli Village, Kapilvastu District, Lumbini Zone, Lumbini Province, Nepal[1] | West Rapti River[1] | Naumure Multipurpose Project Complex[3] | 27.7683, 82.7501 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20221020003427/http://www.doed.gov.np/license/69. Archived from the original on 2022-10-20.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://www.power-technology.com/marketdata/power-plant-profile-naumure-nepal/.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 http://doed.gov.np/pages/naumure-multipurpose-project.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.globaldata.com/store/report/nea-naumure-hydroelectric-power-plant-245-mw-nepal/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.power-technology.com/marketdata/naumure-nepal/.
{{cite web}}: Missing or empty|title=(help)
