Neckarenztal Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Neckarenztal Gas Pipeline is an operating gas pipeline in Germany.[1]
Location
The pipeline runs from south of Lochgau to Wiernsheim in Baden-Württemberg.[1]
Project details
Etzel-Wardenburg (EWA)
- Operator: Terranets BW[1]
- Owner: Terranets BW[1]
- Length: 28 km[1]
- Diameter: 500 mm[1]
- Status: Operating[1]
- Start year: 2023[1]
- Associated infrastructure: South German Gas Pipeline (SEL)[1]
Background
The pipeline was constructed in March 2022 and commissioned in January 2023. The pipeline is referred to as being 'hydrogen ready' but will transport natural gas.[2]