Other names: OCS-A 0534, Park City Wind, Vineyard Wind South, OCS-A 0534, Commonwealth Wind, Vineyard Wind South

New England Wind is a wind farm in pre-construction in Edgartown, Dukes County, Massachusetts, United States.

Project Details

Table 1: Phase-level project details for New England Wind

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Pre-construction[1] 2027 (planned)[2] 804 MW[1] Offshore hard mount[1] Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][3] Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][1]
2 Pre-construction[1] 2027 (planned)[2] 1350 MW[1] Offshore hard mount[1] Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][3] Avangrid Renewables[4]

Location

Table 2: Phase-level location details for New England Wind

Phase Name Location Coordinates (WGS 84)
1 Edgartown, Dukes County, Massachusetts, United States[5] 41.0471, -70.4874 (approximate)[5]
2 West Tisbury, Massachusetts, United States[6][1] 40.9357, -70.7601 (approximate)[6]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 (PDF) https://www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://www.energy.gov/sites/default/files/2023-08/offshore-wind-market-report-2023-edition-summary_0.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.vineyardwind.com/partners. {{cite web}}: Missing or empty |title= (help)
  4. https://www.commonwealthwind.com/benefits. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
  6. 6.0 6.1 (PDF) https://www.boem.gov/sites/default/files/documents/renewable-energy/state-activities/Lease-501-534-Visual.pdf. {{cite web}}: Missing or empty |title= (help)