New England Wind
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: OCS-A 0534, Park City Wind, Vineyard Wind South, OCS-A 0534, Commonwealth Wind, Vineyard Wind South
New England Wind is a wind farm in pre-construction in Edgartown, Dukes County, Massachusetts, United States.
Project Details
Table 1: Phase-level project details for New England Wind
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Pre-construction[1] | 2027 (planned)[2] | 804 MW[1] | Offshore hard mount[1] | Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][3] | Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][1] |
2 | Pre-construction[1] | 2027 (planned)[2] | 1350 MW[1] | Offshore hard mount[1] | Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][3] | Avangrid Renewables[4] |
Location
Table 2: Phase-level location details for New England Wind
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Edgartown, Dukes County, Massachusetts, United States[5] | 41.0471, -70.4874 (approximate)[5] |
2 | West Tisbury, Massachusetts, United States[6][1] | 40.9357, -70.7601 (approximate)[6] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 (PDF) https://www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://www.energy.gov/sites/default/files/2023-08/offshore-wind-market-report-2023-edition-summary_0.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.vineyardwind.com/partners.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.commonwealthwind.com/benefits.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
- ↑ 6.0 6.1 (PDF) https://www.boem.gov/sites/default/files/documents/renewable-energy/state-activities/Lease-501-534-Visual.pdf.
{{cite web}}
: Missing or empty|title=
(help)