New Fortress Angola LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

New Fortress Angola LNG Terminal, also known as Angola LNG Import Terminal, is a cancelled (inferred 4 y) LNG import terminal in Angola.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
New Fortress Angola LNG Terminal Angola ,

The map below shows the location of the terminal: Map is missing for unknown reason; please report this

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
New Fortress Angola LNG Terminal import[1] cancelled (inferred 4 y) – – False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
New Fortress Angola LNG Terminal import[1] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
New Fortress Angola LNG Terminal import[1] cancelled (inferred 4 y) 2019[1] – – – 2023 (cancelled)

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
New Fortress Angola LNG Terminal import[1] cancelled (inferred 4 y) New Fortress Energy Inc [100%][1] New Fortress Energy Inc [100.0%] –

Background

In June 2019, Angola signed an agreement with New Fortress Energy for an LNG regasification terminal. Under the agreement, New Fortress would fund, build, and operate an LNG import and regasification terminal, which would supply gas to power industrial facilities across Angola. New Fortress will also work with the Ministry of Mineral Resources and Petroleum to explore the development of additional indigenous natural gas resources, as well as a domestic liquefaction facility.[2]

There have been no updates in over four years, and the project is presumed cancelled as of 2023.

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://constructionreviewonline.com/2019/06/angola-signs-mou-to-develop-a-liquefied-natural-gas-plant/. {{cite web}}: Missing or empty |title= (help)
  2. ↑ Fidelis John, Angola signs MoU to develop a liquefied natural gas plant, Construction Review, June 12, 2019