Newcastle International Airport solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Newcastle International Airport Phase 1 -Solar Farm (Phase 1), Newcastle International Airport Phase 4 - Solar Farm (Phase 4), Newcastle International Airport Phase 3- Solar Farm (Phase 3), Newcastle International Airport Phase 2 - Solar Farm (Phase 2)
Newcastle International Airport solar farm is a solar photovoltaic (PV) farm in pre-construction in Tyne And Wear, North East, England, United Kingdom.
Project Details
Table 1: Phase-level project details for Newcastle International Airport solar farm
Phase name | Status | Nameplate capacity | Technology |
---|---|---|---|
1 | Construction[1] | 3 MW[1] | PV[1] |
2 | Pre-construction[1] | 4 MW[1] | PV[1] |
3 | Pre-construction[1] | 5 MW[1] | PV[1] |
4 | Pre-construction[1] | 4 MW[1] | PV[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Newcastle International Airport solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Tyne And Wear, North East, England, United Kingdom[1] | 55.0376, -1.6987 (exact)[1] |
2 | Tyne And Wear, North East, England, United Kingdom[1] | 55.0376, -1.6987 (exact)[1] |
3 | Tyne And Wear, North East, England, United Kingdom[1] | 55.0376, -1.6987 (exact)[1] |
4 | Tyne And Wear, North East, England, United Kingdom[1] | 55.0376, -1.6987 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References