Ningxia Liupanshan power station (宁夏六盘山电厂) is an operating power station of at least 660-megawatts (MW) in Qinghe Town Shili Village, Yuanzhou District, Guyuan, Ningxia, China with multiple units, some of which are not currently operating. It is also known as ChinaEnergy Liupanshan power station (Unit 3, Unit 4), 国能宁夏电力六盘山电厂 (Unit 3, Unit 4), 中铝宁夏能源六盘山热电厂 (Unit 1, Unit 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Ningxia Liupanshan power station Qinghe Town Shili Village, Yuanzhou District, Guyuan, Ningxia, China 36.044444, 106.291944 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4: 36.044444, 106.291944

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Emergency/Backup
Unit 1 Operating coal: unknown[1] 330 subcritical yes 2010 False
Unit 2 Operating coal: unknown[1] 330 subcritical yes 2010 False
Unit 3 Construction[2] coal: unknown[1] 1000 ultra-supercritical yes – False
Unit 4 Construction[2] coal: unknown[1] 1000 ultra-supercritical yes – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Ningxia Generate Electricity Group Liupanshan Thermoelectricity Factory [100%] Aluminum Corporation of China Ltd [70.8%]; Ningxia Huimin Investment and Financing Co Ltd [18.0%]; Beijing State-owned Capital Management Center [5.7%]; Ningxia State-owned Investment Management Co Ltd [5.0%]; Ningxia Guoyun Development Private Fund Partnership LP [0.6%]
Unit 2 Ningxia Generate Electricity Group Liupanshan Thermoelectricity Factory [100%] Aluminum Corporation of China Ltd [70.8%]; Ningxia Huimin Investment and Financing Co Ltd [18.0%]; Beijing State-owned Capital Management Center [5.7%]; Ningxia State-owned Investment Management Co Ltd [5.0%]; Ningxia Guoyun Development Private Fund Partnership LP [0.6%]
Unit 3 Ningxia Electric Power Co Ltd of National Energy Group [100%] China Energy Investment Corp [100.0%]
Unit 4 Ningxia Electric Power Co Ltd of National Energy Group [100%] China Energy Investment Corp [100.0%]

Project-level coal details

  • Coal source(s): domestic

Background on CHALCO Plant

The two existing coal-fired units of Ningxia Liupanshan power station, totaling 660 MW, were permitted in 2009[3] and brought online in 2010. The plant is owned by Ningxia Electric Power Group.[4]

Background on ChinaEnergy expansion

ChinaEnergy Liupanshan power station (国能宁夏电力六盘山电厂) is a 2,000-megawatt (MW) coal-fired power plant proposed in Ningxia Province, China. The project's feasibility study successfully passed review as of May 2022.[5]

In March 2023, Units 3 and 4 were approved by the Development and Reform Commission of Ningxia Hui Autonomous Region.[6]

Unit 3 had a commencement ceremony in October 2023[7], and a supervision tender was awarded[8]. In November 2023, a tender for turbine generators was issued[9].

In early 2024, the turbine generator contracts were awarded[10], and piling and main construction contracts were awarded in February-April[11]. In April, the desulfurization EPC contract was awarded[12]. In May, a tender for the DCS system was issued[13]. In June, the construction plan passed review[14], and the first concrete was poured on June 16[15]. In June, the steel structure air-cooled tower EPC contract was awarded[16], and a tender for wastewater zero discharge was issued later that month[17]. In July, the boiler acid wash for Unit 1 was completed[18]. In September, a tender for the front plant area construction was issued[19], and the first boiler steel column was hoisted[20].

In March 2025, the first steel structure air-cooled tower layer of Unit 3 was assembled[21], and the boiler heating surface welding began[22]. In May, the boiler beam was hoisted[23]. From August to September, the air-cooled tower was topped out[24].

In January 2026, the generator outer stator was hoisted[25]. In March, the boiler hydraulic test passed[26], and the generator rotor was inserted in April[27]. In May, the turbine cover for Unit 1 was completed[28].

Unit 4 had its first boiler steel frame hoisted in November 2024[29]. In April 2025, the turbine generator base was poured[30]. In January 2026, the air-cooled tower was completed[31], and the generator inner stator was installed in March[32]. In June, the generator rotor was inserted[33].

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://news.bjx.com.cn/html/20240617/1383172.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 资产评估报告书, 沪东洲资评报字【2016】第 0490231 号
  4. ↑ "宁夏六盘山热电厂正式投入商业运营," 新华社, 2010-11-13
  5. ↑ 宁夏电力六盘山电厂2×1000MW机组扩建工程可行性研究报告顺利通过审查, BJX, 2022-05-25
  6. ↑ 国能六盘山电厂2×1000MW超超临界燃煤机组项目核准批复, news.bjx.com, 2023-03-20
  7. ↑ "六盘山电厂2×100万千瓦清洁煤电项目开工". 北极星电力网. 2023-10-26. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "六盘山电厂扩建施工监理中标". 微信公众平台. 2023-11-20. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "六盘山、中卫热电扩建汽轮发电机组招标". 北极星电力网. 2023-11-20. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "六盘山、中卫汽轮发电机组中标". 微信公众平台. 2024-03-14. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "六盘山、中卫主体建筑安装施工中标". 北极星电力网. 2024-04-09. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "六盘山电厂脱硫EPC中标". 北极星电力网. 2024-04-11. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "六盘山、中卫DCS及ICS项目招标". 北极星电力网. 2024-05-17. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "六盘山电厂项目通过施工组织审查". 微信公众平台. 2024-06-17. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "六盘山电厂主厂房第一方混凝土浇筑". 微信公众平台. 2024-06-17. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "六盘山电厂钢结构间冷塔EPC中标". 北极星电力网. 2024-06-19. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "六盘山电厂脱硫废水零排放系统EPC招标". 北极星电力网. 2024-06-26. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "六盘山1号机组锅炉酸洗完成". 微信公众平台. 2024-08-05. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "六盘山电厂厂前区建筑安装施工招标". 北极星电力网. 2024-09-05. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "六盘山电厂1号锅炉首根立柱吊装". 北极星电力网. 2024-09-14. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "六盘山1号钢结构间冷塔首层钢架合拢". 北极星电力网. 2025-03-31. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ "六盘山1号锅炉受热面首只高压焊口开焊". 微信公众平台. 2025-03-31. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  23. ↑ "六盘山1号锅炉大板梁开吊". 北极星电力网. 2025-05-14. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  24. ↑ "六盘山1号间冷塔顺利到顶". 微信公众平台. 2025-11-20. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  25. ↑ "六盘山1号机组发电机外定子吊装就位". 电力网. 2026-01-20. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  26. ↑ "六盘山1号锅炉水压试验一次成功". 微信公众平台. 2026-04-02. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  27. ↑ "六盘山1号发电机转子穿装完成". 微信公众平台. 2026-06-15. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  28. ↑ "六盘山1号汽轮机扣缸完成". 微信公众平台. 2026-06-15. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  29. ↑ "六盘山2号锅炉首根钢架吊装到位". 微信公众平台. 2024-11-19. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  30. ↑ "六盘山2号汽轮发电机基座浇筑". 微信公众平台. 2025-05-02. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  31. ↑ "六盘山2号间冷塔完成提升". 北极星电力网. 2026-03-09. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  32. ↑ "六盘山2号发电机内定子就位". 微信公众平台. 2026-04-02. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  33. ↑ "六盘山2号发电机转子穿装就位". 微信公众平台. 2026-06-15. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)

Additional data