Nippon Kyushu Works (Yawata Area, Tobata) steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
Nippon Kyushu Works (Yawata Area, Tobata) steel plant (九州制铁所八幡地区, 九州製鉄所八幡地区), also known as Kyushu Works Yawata Area (Tobata Area), is a steel plant in Kitakyushu, Fukuoka, Japan that operates blast furnace (BF), basic oxygen furnace (BOF), and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Kitakyushu, Fukuoka, Japan:
- Location: 1-1 Tobihata-cho, Tobata-ku, Kitakyushu City, Fukuoka Pref. 804-8501, Japan
- Coordinates (WGS 84): 33.911803, 130.838014 (exact)
Background
Tabata Works (Yawata Area) was founded in 1901.[1] In October 2024, Nippon Steel announced its plan to build a new electric arc furnace at the plant aiming to accelerate its decarbonisation efforts. The company sought government subsidy for financing the development. The new furnace is expected to replace its existing BOF facility that is producing 3.6 million tonnes per year of crude steel.[2]
Nippon Steel in 2025 announced plans to invest a total of JPY866.7 (around USD 6.0 billion) billion by 2029, supported by up to JPY251.4 billion (around USD 1.7 billion) in government subsidies. Projects include expanding EAF capacity at Setouchi, converting from BF-BOF to EAF at Yawata, and restarting EAF operations at Shunan.[3] The new EAF furnace at this plant will have a production capacity of 2 mtpa and is scheduled to commence production in the second half of the fiscal year 2029.[4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Announced date | Start date | Workforce size | Power source | Iron ore source | Coal source |
|---|---|---|---|---|---|
| 1896[5] | 1901[6] | 1789[7] | in-plant power generation, also provides power generated via coal to Kyushu Electric Power (does not distinguish between Tobata and Kokura facilities of Yawata); Tobata power station (due to aging, there are plans to replace it with a 2000mw LNG power plant by 2040)[8][9][10][6] | Imported from Australia, Brazil and India[11] | Australia and Canada[12] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| Nippon Steel Corp [100.0%] | 4295877313 [100.0%] | E100000000652 [100.0%] | Nippon Steel Corp [100%][13] | 4295877313 | E100000000652 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | ISO 14001 | ISO 50001 | Responsible steel | Main production equipment |
|---|---|---|---|---|---|
| semi-finished, finished rolled[14] | rail, plate, bar, pipe, piling, wire[14] | yes[15] | unknown[15] | unknown | BF; BOF; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|---|
| announced | – | 2000[16] | 2000[16] |
| operating pre-retirement | 3726[17] | – | 3726[17] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Blast furnace capacity | Nominal iron capacity (total) |
|---|---|---|
| operating | 4543[18] | 4543[18] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Ferronickel | Sinter | Coke | Pellets |
|---|---|---|---|
| NF | NF | NF | NF |
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
| Year | BOF production | Total (all routes) |
|---|---|---|
| 2019 | 3599[6] | 3599[6] |
| 2020 | 3254[19] | 3254[19] |
| 2021 | 3727[17] | 3727[17] |
| 2022 | 3611[20] | 3611[20] |
| 2023 | 3723[21] | 3723[21] |
| 2024 | 3700[22] | 3700[22] |
| 2025 | unknown | – |
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
| Year | BF production | Other/unknown iron production |
|---|---|---|
| 2019 | unknown | unknown |
| 2020 | unknown | unknown |
| 2021 | unknown | unknown |
| 2022 | unknown | unknown |
| 2023 | unknown | unknown |
| 2024 | unknown | – |
| 2025 | unknown | – |
Unit Details
Table 9: Blast Furnace Details
| Unit name | Status | Start date | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
|---|---|---|---|---|---|---|
| BF 4 | operating[23] | 1972[24] | 5000.0[6][25] | 4543[18] | unknown | 2014-04-20[24] |
Table 10: Electric Arc Furnace Details
| Unit name | Status | Announced date | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|---|---|
| unknown EAF (1) | announced[26] | 2024-10-11[26][27] | 2029[28] | Tenova Consteel[29][29] | 2000[16] | 340.0[29] |
Table 11: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI | % HBI | % sponge iron (unknown if DRI or HBI) | % basic/merchant pig iron | % granulated pig iron | % pig iron (unknown if basic/merchant or granulated) | % other iron |
|---|---|---|---|---|---|---|---|---|---|
| unknown EAF (1) | None | unknown | unknown | unknown | unknown | unknown | unknown | unknown | unknown |
Table 12: Basic Oxygen Furnace Details
| Unit name | Status | Retired date | Current capacity (ttpa) | Current size |
|---|---|---|---|---|
| unknown BOF (1) | operating pre-retirement[27][20] | 2029 | 609[17] | 170.0 tonnes[6][25] |
| unknown BOF (2) | operating pre-retirement[27][20] | 2029 | 609[17] | 170.0 tonnes[6][25] |
| unknown BOF (3) | operating pre-retirement[27][20] | 2029 | 1254[17] | 350.0 tonnes[6][25] |
| unknown BOF (4) | operating pre-retirement[27][20] | 2029 | 1254[17] | 350.0 tonnes[6][25] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ "Basic Facts About Nippon Steel" (PDF). Nippon Steel. 2019. Retrieved 21 February 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ Maekawa, Yusuke (2024-10-15). "* | Latest Market News | Argus Media". www.argusmedia.com. Retrieved 2024-12-17.
- ↑ "2025 Integrated Report Updates: Nippon Steel - Transition Asia". transitionasia.org. Retrieved 2025-11-06.
- ↑ "Nippon Steel to invest in EAFs at three plants". www.steelorbis.com. Retrieved 2025-11-06.
- ↑ (PDF) https://web.archive.org/web/20240124202919/https://core.ac.uk/download/pdf/229950652.pdf. Archived from the original (PDF) on 2024-01-24.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 (PDF) https://web.archive.org/web/20200614234628/https://www.nipponsteel.com/en/ir/library/pdf/factbook2019_all.pdf. Archived from the original (PDF) on 2020-06-14.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220120194201/https://www.nipponsteel.com/en/factbook/09-01.html. Archived from the original on 2022-01-20.
{{cite web}}: Missing or empty|title=(help) - ↑ https://beyond-coal.jp/en/news/data-update-202505/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.gem.wiki/Tobata_power_station.
{{cite web}}: Missing or empty|title=(help) - ↑ https://japanenergyhub.com/news/nippon-steel-kyushu-yawata-lng-project/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240124203736/https://www.nipponsteel.com/en/factbook/2023/11-06.html. Archived from the original on 2024-01-24.
{{cite web}}: Missing or empty|title=(help) - ↑ "Raw Materials and Fuel". www.nipponsteel.com. Archived from the original on 2025-01-07. Retrieved 2024-12-19.
- ↑ https://web.archive.org/web/20211020151842/https://www.nipponsteel.com/works/kyushu/index.html. Archived from the original on 2021-10-20.
{{cite web}}: Missing or empty|title=(help) - ↑ 14.0 14.1 https://web.archive.org/web/20220120104734/https://www.nipponsteel.com/works/kyushu/yawata/product/index.html. Archived from the original on 2022-01-20.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 https://web.archive.org/web/20201029114814/https://www.nipponsteel.com/works/kyushu/yawata/iso/index.html. Archived from the original on 2020-10-29.
{{cite web}}: Missing or empty|title=(help) - ↑ 16.0 16.1 16.2 https://www.recyclingtoday.com/news/nippon-steel-electric-arc-furnace-investments-japan-government-funds-recycling/.
{{cite web}}: Missing or empty|title=(help) - ↑ 17.0 17.1 17.2 17.3 17.4 17.5 17.6 17.7 https://www.nipponsteel.com/en/factbook/2022/11-04.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 18.0 18.1 18.2 https://web.archive.org/web/20220722183713/https://www.sciencedirect.com/topics/chemistry/blast-furnace. Archived from the original on 2022-07-22.
{{cite web}}: Missing or empty|title=(help) - ↑ 19.0 19.1 https://web.archive.org/web/20220318092755/https://www.nipponsteel.com/en/factbook/11-04.html. Archived from the original on 2022-03-18.
{{cite web}}: Missing or empty|title=(help) - ↑ 20.0 20.1 20.2 20.3 20.4 20.5 https://web.archive.org/web/20240123003258/https://www.nipponsteel.com/en/factbook/2023/11-04.html. Archived from the original on 2024-01-23.
{{cite web}}: Missing or empty|title=(help) - ↑ 21.0 21.1 "Outline of the Manufacturing Base". www.nipponsteel.com. Archived from the original on 2025-01-07. Retrieved 2024-12-19.
- ↑ 22.0 22.1 https://www.nipponsteel.com/ir/.
{{cite web}}: Missing or empty|title=(help) - ↑ "Interests in raw materials" (PDF). 2023. Archived from the original (PDF) on 2024-01-25. Retrieved 2023.
{{cite web}}: Check date values in:|access-date=(help) - ↑ 24.0 24.1 https://web.archive.org/web/20210627232425/https://www.nipponsteel.com/en/news/20140421_100.html. Archived from the original on 2021-06-27.
{{cite web}}: Missing or empty|title=(help) - ↑ 25.0 25.1 25.2 25.3 25.4 (PDF) https://web.archive.org/web/20220130014556/https://www.nipponsteel.com/en/ir/library/pdf/nsc_en_ir_2021_a3.pdf. Archived from the original (PDF) on 2022-01-30.
{{cite web}}: Missing or empty|title=(help) - ↑ 26.0 26.1 Halina Yermolenko (2024-10-16). "Nippon Steel has applied for a subsidy to build new EAFs". GMK Center. Archived from the original on 2024-12-18. Retrieved 2024-12-16.
- ↑ 27.0 27.1 27.2 27.3 27.4 Yusuke Maekawa (2024-10-15). "*". www.argusmedia.com. Archived from the original on 2024-12-18. Retrieved 2024-12-16.
{{cite web}}: Text "Argus Media" ignored (help); Text "Latest Market News" ignored (help) - ↑ https://www.steelorbis.com/steel-news/latest-news/nippon-steel-to-invest-in-eafs-at-three-plants-1394154.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 29.0 29.1 29.2 https://www.aist.org/tenova-selected-to-supply-world%E2%80%99s-largest-eaf-to-nippon-steel.
{{cite web}}: Missing or empty|title=(help)
