30em

📝 Help us learn how people like you use GEM Wiki! Take this short survey!📝

Data will be retained following our Privacy Policy. The survey is completed in Google Forms (Privacy policy and Terms of Service)

Nita solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Nita solar farm (Planta solar fotovoltaica Nita) is a solar photovoltaic (PV) farm in pre-construction in Mérida, Badajoz, Extremadura, Spain.

Project Details

Table 1: Phase-level project details for Nita solar farm

Phase name Status Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 208 MWac[2] PV[3] Compañía Española de Petróleos SA [100%][4] Mitra NU SLU[1]
2 Pre-construction[1] 95 MWac[2] PV[3] Compañía Española de Petróleos SA [100%][4] Mitra NU SLU[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Nita solar farm

Phase Name Location Coordinates (WGS 84)
1 Mérida, Badajoz, Extremadura, Spain[2] 39.0148, -6.3850 (approximate)[2]
2 Mérida, Badajoz, Extremadura, Spain[2] 39.0148, -6.3850 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://www.boe.es/diario_boe/txt.php?id=BOE-B-2024-4209 https://www.energiaestrategica.com/fervor-solar-en-espana-solo-los-proyectos-presentados-este-ano-duplicarian-a-toda-potencia-la-instalada/, https://www.boe.es/diario_boe/txt.php?id=BOE-B-2024-4209. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 "BOE-B-2024-4209 Anuncio del Área Funcional de Industria y Energía de la Delegación del Gobierno en Extremadura, por el que se somete a Información Pública la solicitud de Autorización Administrativa Previa y Declaración de Impacto Ambiental de las plantas solares fotovoltaicas "Nita I" de 208 MW de potencia instalada y "Nita II", de 95 MW de potencia instalada". Boletín Oficial del Estado. 2024-02-08. Archived from the original on 2024-04-01. Retrieved 2024-03-07.
  3. 3.0 3.1 "Fervor solar en España: sólo los proyectos presentados este año duplicarían a toda potencia la instalada". Energía Estratégica España. 2022-05-31. Archived from the original on 2024-02-01.
  4. 4.0 4.1 "Cepsa, Iberdrola y Solaria son las empresas que más potencia fotovoltaica presentaron en 2022". Energía Estratégica España. 2023-01-03. Archived from the original on 2024-02-01.