Nobles wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Nobles wind farm is an operating wind farm in Wilmont, Nobles County, Minnesota, United States.
Project Details
Table 1: Phase-level project details for Nobles wind farm
Phase name | Status | Commissioning year | Retired year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|---|
1 | Retired[1] | 2010[2] | 2022[1] | 201 MW[3] | Onshore[3] | EDF Renewables; Xcel Energy Inc (法國電力再生能源公司)[4] | EDF Renewables (法國電力再生能源公司)[5] |
2 | Operating[2] | 2020[3] | – | 250 MW[3] | Onshore[3] | ALLETE Inc; Bright Canyon Energy; Tenaska Inc[6] | Tenaska[7] |
RP1 | Operating[2] | 2022[1] | – | 201 MW[3] | Onshore[3] | EDF Renewables; Xcel Energy Inc (法國電力再生能源公司)[4] | EDF Renewables (法國電力再生能源公司)[5] |
Location
Table 2: Phase-level location details for Nobles wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Wilmont, Nobles County, Minnesota, United States[3] | 43.7277, -95.8370 (exact)[3] |
2 | Nobles County, Minnesota, United States[3] | 43.7849, -95.8983 (exact)[3] |
RP1 | Wilmont, Nobles County, Minnesota, United States[3] | 43.7277, -95.8370 (exact)[3] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240126123430/https://mn.my.xcelenergy.com/s/state-selector?return=%2Fs%2Fabout%2Fnewsroom%2Fpress-release%2Fxcel-energy-completes-upgrades-to-nobles-wind-farm-MCXU3K4A54GVGFBJPSN2A7SC2W54. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ 4.0 4.1 https://www.edf-re.com/press-release/enxco-xcel-energy-close-201-megawatt-wind-project/ https://www.edf-re.com/press-release/enxco-xcel-energy-close-201-megawatt-wind-project/, https://www.edf-re.com/press-release/enxco-xcel-energy-close-201-megawatt-wind-project/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20210927180832/https://www.thewindpower.net/windfarm_en_4363.php. Archived from the original on 27 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.tenaska.com/nobles-2-wind-farm-in-southwest-minnesota-begins-commercial-operation/, https://www.tenaska.com/nobles-2-wind-farm-in-southwest-minnesota-begins-commercial-operation/ https://www.tenaska.com/nobles-2-wind-farm-in-southwest-minnesota-begins-commercial-operation/, https://www.tenaska.com/nobles-2-wind-farm-in-southwest-minnesota-begins-commercial-operation/, https://www.tenaska.com/nobles-2-wind-farm-in-southwest-minnesota-begins-commercial-operation/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131022106/https://www.tenaska.com/nobles-2-wind-farm-in-southwest-minnesota-begins-commercial-operation/. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)