Nordestão Gas Pipeline

From Global Energy Monitor

[português]

Nordestão Gas Pipeline (also known as Guamaré-Cabo) is an operating gas pipeline running within Brazil.

Location

The pipeline starts in Guamaré (Rio Grande do Norte state) and runs to Cabo de Santo Agostinho (Pernambuco state).[1]

Loading map...

Project Details

  • Operator: Transpetro[2]
  • Parent company: Petrobras[2]
  • Capacity: 2,271 m³/day (0.83 bcm/year)[1]
  • Length: 426.8 km / 265.2 miles[1]
  • Diameter: 12 inches[1]
  • Status: Operating[1]
  • Start Year:
  • Cost:
  • Financing:

Expansion

A variant loop of 32.2 km/ 20 miles begins at kilometer 382.5 of the Nordestão Gas Pipeline in Recife and reconnects to the pipeline at kilometer 403.3.[1]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "AUTORIZAÇÃO Nº 536, DE 30 DE JULHO DE 2020". Government of Brazil. July 30, 2020.
  2. 2.0 2.1 Reed, David; Narvaez, Olga; Tepedino, Alexandre; Frisoli, Caetano (2006-10-11). "An Example of Business And Operational Integration For a Gas Pipeline". Cite journal requires |journal= (help)

Related SourceWatch articles

External resources

External articles