Northern Vietnam LNG Terminal
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Northern Vietnam LNG Terminal is an LNG import terminal in Vietnam with units that are proposed.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Phase 1 | Hai Phong, Hai Phong, Vietnam[1] | 20.823732, 106.796686 (approximate) |
| Phase 2 | Hai Phong, Hai Phong, Vietnam[1] | 20.823732, 106.796686 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Phase 1 | import[1] | proposed[1] | 0.7 mtpa[1] | 1.2 mtpa | False | – |
| Phase 2 | import[1] | proposed[1] | 0.5 mtpa[1] | 1.2 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Phase 1 | import[1] | – | – |
| Phase 2 | import[1] | – | – |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Phase 1 | import[1] | proposed[1] | 2021[1] | – | – | –[1][1] | – |
| Phase 2 | import[1] | proposed[1] | 2021[1] | – | – | – | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Phase 1 | import[1] | proposed[1] | ITECO JSC; Excelerate Energy LP[1][1] | Excelerate Energy Holdings LLC; Excelerate Energy Inc; ITECO JSC | – |
| Phase 2 | import[1] | proposed[1] | ITECO JSC; Excelerate Energy LP[1][1] | Excelerate Energy Holdings LLC; Excelerate Energy Inc; ITECO JSC | – |
Background
In August 2024, The Investor reported that the US's Excelerate Energy and Vietnam's ITECO JSC, a private industrial company, signed a term sheet to co-develop an LNG terminal in Hai Phong, Vietnam. The project will be built in two phases, with the first 0.7 mtpa phase planned to come online in 2027. The full capacity of the project will be 1.2 mtpa. The project was proposed as early as December 2021, when ITECO signed a share purchase agreement with JAPEX related to developing the facility.[2]
As of August 2026, there was not evidence of progress in the development of the terminal, and it is inferred to be shelved.[1][3]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 https://theinvestor.vn/uss-excelerate-energy-eyes-lng-terminal-in-northern-vietnam-d11687.html.
{{cite web}}: Missing or empty|title=(help) - ↑ theinvestor.vn. "US's Excelerate Energy eyes LNG terminal in northern Vietnam". theinvestor.vn. Retrieved 2024-09-11.
- ↑ "https://www.gasworld.com/story/excelerate-energy-to-develop-lng-import-terminal-in-vietnam/2142607.article/".
{{cite web}}: External link in(help)CS1 maint: url-status (link)|title=
