Nuza solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Nuza solar farm (Planta fotovoltaica Nuza Solar) is a solar photovoltaic (PV) farm in pre-construction in Campo de Gibraltar, Cádiz, Andalucía, Spain.
Project Details
Table 1: Phase-level project details for Nuza solar farm
| Phase name | Status | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|
| 1 | Pre-construction[1] | 62.5 MWp/dc[2] | PV[3] | TotalEnergies SE [100%][4] |
| 2 | Pre-construction[5] | 62.5 MWp/dc[2] | PV[2] | TotalEnergies SE [100%][4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Nuza solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Campo de Gibraltar, Cádiz, Andalucía, Spain[3] | 36.4327, -5.4519 (approximate)[3] |
| 2 | Campo de Gibraltar, Cádiz, Andalucía, Spain[3] | 36.4327, -5.4519 (approximate)[3] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2580, https://www.pv-magazine.es/2021/08/10/iberdrola-promueve-una-planta-de-41995-mw-en-huelva/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-6065 https://energiaestrategica.es/european-energy-avanza-con-dos-plantas-fotovoltaicas-tras-recibir-dias-positiva/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2580, https://www.pv-magazine.es/2021/08/10/iberdrola-promueve-una-planta-de-41995-mw-en-huelva/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-6065.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 "BOE-A-2023-2580 Resolución de 17 de enero de 2023, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula declaración de impacto ambiental del proyecto "Plantas Solares Fotovoltaicas y sus infraestructuras de evacuación en el Nudo Jordana, en las provincias de Cádiz y Málaga"". Boletín Oficial del Estado. 2023-01-31. Archived from the original on 2024-04-04. Retrieved 2024-03-27.
- ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20240201221209/https://www.pv-magazine.es/2021/08/10/iberdrola-promueve-una-planta-de-41995-mw-en-huelva/. Archived from the original on 2024-02-01.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 "European Energy avanza con dos plantas fotovoltaicas tras recibir DIAs positiva". Energía Estratégica España. 2023-03-07. Archived from the original on 2024-04-04. Retrieved 2024-03-27.
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2580, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-6061 https://energiaestrategica.es/european-energy-avanza-con-dos-plantas-fotovoltaicas-tras-recibir-dias-positiva/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2580, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-6061.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
