Nyadi Phidi hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Nyadi Fidi
Nyadi Phidi hydroelectric plant is a hydroelectric power plant under construction in Marsyandi Rural Municipality, Lamjung District, Gandaki Zone, Gandaki Province, Nepal.
Project Details
Table 1: Project details for Nyadi Phidi hydroelectric plant
| Status | Nameplate capacity | Technology type | Owner |
|---|---|---|---|
| Construction[1][2][3] | 21 MW[4] | Run-of-river[4] | North Summit Hydro Pvt Ltd [100%][5] |
Location
Table 2: Location details for Nyadi Phidi hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Marsyandi Rural Municipality, Lamjung District, Gandaki Zone, Gandaki Province, Nepal[4] | Nyadi River[4] | 28.2106, 84.0017 (approximate)[4] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20220517020654/https://nwrmap.info/hydropower/nyadi-phidi-hydropower-project. Archived from the original on 2022-05-17.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.nshydro.com.np/nyadi-phidi/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://myrepublica.nagariknetwork.com/news/north-summit-hydro-to-issue-384-million-ipo-shares-machhapuchchhre-capital--31-90.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://www.investopaper.com/news/four-banks-to-invest-in-nyadi-phidi-hydropower-project/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20230302183227/https://www.investopaper.com/news/hydropower-projects-with-construction-license/. Archived from the original on 2023-03-02.
{{cite web}}: Missing or empty|title=(help)
