Olmedilla solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Iberdrola Olmedilla (Phase 1)

Olmedilla solar farm is an operating solar photovoltaic (PV) farm in Olmedilla de Alarcón, Cuenca, Spain.

Project Details

Table 1: Phase-level project details for Olmedilla solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2022[1] 42 MWp/dc[2] PV[3] Iberdrola SA [100%][4] Iberdrola Renovables Energia[4]
3 Operating[5] 2008[5] 11.5 MW[5] PV[5] Fotowatio Renewable Ventures (FRV) BV [100%][5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Olmedilla solar farm

Phase Name Location Coordinates (WGS 84)
1 Olmedilla de Alarcón, Cuenca, Spain[4] 39.6153, -2.1077 (approximate)[4]
3 Cuenca, Castile-La Mancha, Spain[5] 39.6145, -2.1034 (approximate)[5]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240206151708/https://www.pv-magazine.es/2022/01/31/iberdrola-inicia-la-puesta-de-dos-plantas-de-50-mw-en-cuenca/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240126042525/https://energia.serviciosmin.gob.es/Pretor/Vista/Informes/InformesInstalaciones.aspx. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240201221430/https://www.iberdrola.com/sala-comunicacion/noticias/detalle/iberdrola-arranca-construccion-fotovoltaicos-castilla-la-mancha. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240206165514/https://www.iberdrola.com/press-room/news/detail/iberdrola-commissions-first-photovoltaic-plant-castile-la-mancha. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 https://web.archive.org/web/20240201223433/https://www.power-technology.com/marketdata/power-plant-profile-olmedilla-solar-park-iii-spain/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)