Optimist Solar

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: MS Solar 7

Optimist Solar is a solar photovoltaic (PV) farm in pre-construction in Clay County, Mississippi, United States.

Project Details

Table 1: Phase-level project details for Optimist Solar

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
OEMS7 Pre-construction[1] 2026 (planned)[1] 200 MWac[1] PV[1] Origis Energy [100%][2] Origis Energy[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Optimist Solar

Phase Name Location Coordinates (WGS 84)
OEMS7 Clay County, Mississippi, United States[1] 33.6435, -88.5940 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. ↑ 2.0 2.1 https://web.archive.org/web/20240201191821/https://origisenergy.com/project/optimist-solar-storage/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)